My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5916 8TH AVE W 2016-01-01 MF Import
>
Address Records
>
8TH AVE W
>
5916
>
5916 8TH AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2017 12:03:58 AM
Creation date
4/3/2017 1:47:40 PM
Metadata
Fields
Template:
Address Document
Street Name
8TH AVE W
Street Number
5916
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plar� dated <br />5. Connect side sewer per City Standard #601. <br />�.... <br />(� Connect side sewer per City Standard #'s 601, 602, 604. <br />•._- <br />7. Connect all rooftop downspouts to the side sewer. <br />��Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout infillration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _ <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginniny the project. <br />(,1�.� Install erosion control measures as determined by the Public Works inspector, such as silt <br />�� fence, straw bales, swales, or erosion blankets. <br />12. Instali erosion control measures per City of Everett Standards for small parcels <br />�13. Remove erosion control measures upon completion of the project prior to final approval of the <br />=r permit. <br />;� 14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />" approved, permitted site. i!o wasting of material is allowed on this building lot. <br />15. Rerriove and replace curb, c3utter and sidewalk as per City of Everett Standard Plan #'s 305A <br />� 3J6 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />dr'veways and any broker� or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard #307. <br />17. Pave driveway from the front property line out to the street paving. <br />18. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan #W02 with a aas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across tlie public �ight-of-way. <br />21. A sprinkler system is required for this building in c�mpliance with the requirements oi NFDA <br />Standards 13D. <br />a:,�c�T�T=�:_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.