Laserfiche WebLink
.: <br />August !, 1979 <br />Robert A. Preston <br />11889 98th Avenue N.E. <br />KirWand, Washingto� 98033 <br />RE: 8614 (A)s 8616 (B)9 8620 (C)y 8706 (D) Sih P.ve. \?'. <br />Dear hir. Preston: <br />Our Public Wor4s Depa�'tment inspector visited the Sth Avenue site o# y�ur <br />'� short plat this week and leamcd that 5uilding of 5-plexes havc begem on tne <br />nocthem two (2) lots without a permiS for right-of-way use. Your current <br />method of operation appears to be tfie same as the method used to circumvent <br />proper improvements on the southern two i2) lots. I was sure that our discussion <br />on May 17, 1979 clearly ldentified the next steps necessary for you to proce�d <br />with the second two (2) lots. <br />�¢ilC7. <br />You are now directed to submit to this ofYice, on or before 3e}y 9tfi, a realistic <br />schedule detailing how and when you intend co comply �vith applicable City <br />Codes and State Laws ldentifled ln this letLer. Fallure to submit such a sc!iedule <br />or failure ta strictly adhere to that schedule shall mean an immediate "5top <br />• Work" beIng placed on youc siteso <br />Our concern Is your nen-compliance vilth written and verbal agreements with <br />the City, with State Law and with Chapier I3 of Everett Ci.ty Codes as amended <br />by Ordinance 555-78, and with Ordinance SSb-73, City of Hverett Public WorFcs <br />DeparimenL staff review of the pians for t�ie proposed F3ve pleaes at the above <br />address cannot begin until the completion of an envIronmental impact review <br />of the proposal. . <br />�,��'-• <br />. . . � 5 �;i�_S <br />- ]a�.Y,'` , .. <br />We have not at this time received a Nashington State Environmental Policy <br />AcL �S.E.P.A.) atiecklist for analysis of em�ironmental cancerns. That process <br />takes 20 to 30 days. Please contact E)ob La�dle> of the Clty of Everett P'xanning <br />Department at 259-8731 for additionzi lnformation you may need conceming <br />thls S.E.P.A. checkl:st requirement. <br />Aithough the Publlc'tVor!cs Department review will not be�in until we receive <br />a S.E.P.A. Declaration of Non-Significance, I wouid liY.e to make some very <br />preliminary comments. First, your proposed development Is occurring in an <br />