My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8706 8TH AVE W 2016-01-01 MF Import
>
Address Records
>
8TH AVE W
>
8706
>
8706 8TH AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2017 11:41:45 PM
Creation date
4/3/2017 1:53:48 PM
Metadata
Fields
Template:
Address Document
Street Name
8TH AVE W
Street Number
8706
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br />,r, • �' <br />�" � <br />August 1, 1979 <br />Robert A. Preston <br />11889 982h Avenue N.E. <br />Kirkland, `Nashingion 98033 <br />��� �v)iV , <br />� ✓ <br />�.,� "/ G`�/ �� <br />C �� <br />X <br />G' <br />Cr <br />REs 8614 (A)s 8616 (B), 362t1 (C)p ��G: (R? 3eh P,ve. W. <br />Dear 61r. Preston: <br />Our Public Wor!cs Department Inspector visited ihe 8th Avenue si:e ot your <br />shor4 plat this :veek and leamed that 6uilding of 5-plexes have begu�� on the <br />northern two (2) lots without a peRnit for rioht-of-way use. Your currenL <br />method of operation ap�ears to be tfie same as the method used to circumvent <br />proper improvements on ihe southern two (2) lots. 1 was sure that our discussion <br />on May 17, 1974 cilearly identffied the next steps necessary for you to proceed <br />wlth the sccond two (2) lots. <br />,�u�. <br />You are now directed io submit to this offlce, on or before 3�y 9th, a reaJlstIc <br />schedule detailing how and when you lntend to comply rrith appJicable City <br />Codes and State Laws identifIed ln this letter. Failure to submit such a schedule <br />or fallure to strictly adhere to thaS schedule shall mean an immediate "Stop <br />Work" being placed on your siteso <br />Our concem Is your non-complIance with written and verbal agreements with <br />the CIty, with State Law and with Chapttr 13 of Everett City Codes as amended <br />by Ordinance SSS-78, and with Ordinance SSb-73� City of £verett Public `Norks <br />Department staff revIew of the plans foe tiic proE.�osed flve plexes at the above <br />address cannot begin until ihe completion of an environmentaJ impact review <br />of the proposai. <br />We have not at this tIme received a Washington Siate Envlronmental Policy <br />Act (S.E.P.A.) checklist for analysis of environmental concerns. That �rocess <br />takes 20 to 30 days. Please contact t3ob T.andles of the City of Everett Planning <br />Department at 259-8731 for additional infocmation you may need concerning <br />thls S.E.P.A. checklist requirement. <br />Although the Public ?Jor4s Department review wili not begin untIl we receive <br />a S.E.P.A. Declaration of Non-Slgnificance, I would like ta make some very <br />preliminary comments. First, your proposed development ls occurring ln an <br />�. _ ;'f <br />r� <br />a_�:� <br />.,'�7.Y,'�=• ._. � ��. <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.