My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10311 8TH DR SE 2016-01-01 MF Import
>
Address Records
>
8TH DR SE
>
10311
>
10311 8TH DR SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 6:22:05 PM
Creation date
4/3/2017 1:56:34 PM
Metadata
Fields
Template:
Address Document
Street Name
8TH DR SE
Street Number
10311
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 24, 1997 <br />PUBL/� L�l/O/�5' <br />MCI <br />15418 - 29th Avenue SE <br />Mill Creek, WA 9R012 <br />ItE: Owner <br />Plan Check No. <br />Job Address <br />Dear Ms. Matteson: <br />MCI <br />54029 - 54035 inclusive <br />103ll - 8th Drive SE <br />10321 - 8th Drive SE <br />10403 - 8th Diive SE <br />I0409 - 8th Drive SC <br />]0415 - 8th Drive SE <br />1042! - 8th Drive SE <br />I0425 - 8th Drive SE <br />In response to your aoplication for a construction permit, your plans have been examined and you are <br />advised [hat the issuance of a permit is being witliheld for the reasons (isted below. These comments <br />addres� building issues only, additional revisions or additions may be required by other departments <br />(such as Utilities, Planning or Fire�. <br />In order for the processin� of your applicatio� to continue, 'st will be necessary to <br />provide the Building Divis�on with completed applications ar:� five (5) site plans <br />per lot retlecting the corrections requested. <br />1. Application for construction permit is not completed. Fill out applicatio�i completely (see <br />enclosed application). Provide basic number and short plat number on application. <br />2. See enclosed checklist for site plan. Include all items from checklist on site plan. <br />3. Indicate on site plzn how roof downspouts will connect to the storm drainage stub provided at <br />the front of the lot. <br />4. Plan check fees are rec, uired to be paid at the time of application. <br />CITY OF EVERETT• 32Q0 Cedar Street • Everett, WA 98201 •(206) 257-8800 • Fax (206) 257-88F3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.