My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8402 8TH PL SE 2016-01-01 MF Import
>
Address Records
>
8TH PL SE
>
8402
>
8402 8TH PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2017 11:16:20 PM
Creation date
4/3/2017 2:02:23 PM
Metadata
Fields
Template:
Address Document
Street Name
8TH PL SE
Street Number
8402
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />06/15/1998 Page 2 <br />________________________________________________________________________________ <br />Date Range :O1/09/1989 - O5/31/1998 <br />CM Work Order Range :0810800810001 - UT2830-30-322Pattern :7101236730270 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />-------------------------------------------------------------------------------- <br />CM WORK ORDER ID: 7101236730270 (continued) <br />V2225 <br />V2230 <br />V3200 <br />V6401 <br />VH0012 <br />VJ0002 <br />VJ0004 <br />VJ0017 <br />88 FORD 8YD <br />91 FORD F800 DUMP 5 YARD <br />�0 CASE VIBROMAX W?.5 ROLLER <br />80 CASE FL�ATBED TA.AILER <br />'97 CAT BACKHOE <br />93 INTERNATIONAL 10 YD <br />'95 CHFV 1-TON <br />'96 FORD 5 YARD <br />1 <br />16 <br />1 <br />1 <br />16 <br />2 <br />16 <br />1 <br />00 <br />00 <br />00 <br />00 <br />00 <br />00 <br />00 <br />00 <br />Total Vehicle Cost: <br />15.34 <br />16.00 <br />18.86 <br />0.00 <br />454.40 <br />42.00 <br />92.80 <br />15.4& <br />689.84 <br />Work Description: <br />-----------------------------------------------------------------------------�--- <br />CUSTOMER INV#13005 <br />INSTALLED 60' OF 12" CONCRETE PIPE FROM EXISTING 12" PIPE TO NEW CB15. FILLED <br />IN DITCH PER CUSTOMER. <br />Total cost for work order 7101236730270: <br />2224.40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.