Laserfiche WebLink
CL03ED CM WORR ORDERS REpORT <br />Total Utility Maintenance Management System <br />___________________________________03/26/1997=====_________________=====Page=1== <br />Date Range :O1/09/1989 - 03/21/1997 <br />CM Work Order Range :1001091070001 - 7401196770910Pattern :7101196750998 <br />Item Range :<glank> - WVL3694L05 <br />Program ALL Function ALL i'attern :* <br />_ Activity ALL <br />________________________________________----- <br />CM WORK ORDER ID: 7101196750998 Title: RENEW 3105 3TH ST <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS7.795A003 -- WATER SERVICE <br />Location ID: __ <br />Program 710 Function 119 <br />Date Completed: 03/03/1997 Activity 675 <br />Overall Craft: <br />Issued: 02/10/1997 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL CSG <br />WST TDE1 <br />UL WTE <br />M.iterials: <br />�U <br />ADAP34000647 <br />CORP3400184'7 <br />COUP34004447 <br />N/A <br />PIPE34060647 <br />SADD460182¢7 <br />Name <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />-------------------- <br />CAVANAFI, SHANE G. <br />THOMPSON, DWAYNE E. <br />WESTVANG, TERRY E. <br />Description <br />ADA1'TER 3/4" FIP X INSTA-TITE@ <br />CORP STOP 3/4" CCT X INSTA @ <br />COUPLING 3/4" MIP X COP @ <br />TRACING WIRE <br />PIPE 3/4" POLY I.P.S. <br />SERVICE SADDI�E 8" W/3/4" CCT <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />2.00 <br />2.00 <br />2.00 <br />Cost <br />26.96 <br />38.30 <br />31.56 <br />Total Labor Cost: g6,g2 <br />Date � Used Cost <br />-- -------- ---------- <br />03/03/1997 1 7.41 <br />02/11/1997 1 15.10 <br />03103/1997 � 3 59 <br />O�J3/1997 _ 14 i �a" <br />03/03/1997 iq 3 ZZ <br />02/11/1997 1 14.14 <br />Total MateYial Cost: <br />Vehicles: <br />ID Description Hours Cost <br />-------- ------------------------------ <br />V2117 ------ ---------- <br />91 CHEV 1-TON HYD UNIT 2.00 10.60 <br />V2146 87 CHEV 1 TON W/HYD. UNIT <br />VH0003 94 CAT BACKHOE Z'�� 9•60 <br />2.00 48.40 <br />Total Vehicle Cost: 68 60 <br />Total cost for work arder 7101'_96750998: <br />45.Oq <br />5��' <br />�f3 , <br />210.42 <br />