My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8728 9TH AVE SE 2016-01-01 MF Import
>
Address Records
>
9TH AVE SE
>
8728
>
8728 9TH AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2017 10:04:30 PM
Creation date
4/3/2017 2:21:02 PM
Metadata
Fields
Template:
Address Document
Street Name
9TH AVE SE
Street Number
8728
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPAIR SPECIFICATIONS AND LIST OP WORK TO BE BID <br />Page 2 of 4 <br />Pddress: a��$ 9th Ave. SE <br />1. Roofing Tear off roofing complete on south hip of <br />main roof down to skip sheathing. install new 15# <br />asphalt impregnated felt on sheathing. install new 220# <br />fiberglass composition roofing over entire house roof in <br />accordance with manufacturer's installation instructions <br />and register date of application with manufacturer. <br />Owner choice of roofing color. <br />Owner will tear off roofing and sheathing on shed. <br />Contractor : install new roof. Install 2 x 6 rafters, <br />hip plan, .tied into existing joists on 2:12 slope. <br />Install 1/2" CDX plywood sheathing over rafters. <br />Install 1 x 6 facia, cedar, over rafter tails and 3/8" <br />303 plywood soffit at perimeter. Install 15# asphalt <br />impregnated felt over roof sheathing, 19" lap. Install <br />selvage edge roll roofing over felt in accordance with <br />manufacturer's installation instructions. <br />New shed roof . not tie into existing house roof. <br />Extend �x.isting. gutter on west side of house to <br />northwest corner and add matching downspout. <br />09 <br />$ /923, � <br />2. Paintinq Power wash existing _;iding an hnuse and <br />shed. Scrape all loose and peeliiig paint. Prime all <br />new or bare wood. Paint hnuse and shed including trim, <br />two coats, 2 colors, oil base exterior paint, owner <br />choice of col�r, �n conformance with manufacturer's <br />application instructions. <br />3. Windows Tear out all existing windows in house. <br />Install new insulated windows with screens. Fixed <br />windows , raw units stopped in with wood. Operable <br />windows . aluminum frames, mill finish, Milgard or <br />equal. Install as per following schedule: <br />Location <br />S.W. bedroom, west wall <br />S.W. bedroom, east wall <br />West center bedroom <br />East bedroom <br />Half bath <br />Full bath <br />Living room <br />Kitchen, north end, <br />east wall <br />Type/Comments <br />bottom slider/egress sized opening <br />cas�ment where jalousie was removed, <br />fixed elsewhere <br />slider/egress sized, cut and reframe <br />opening for sill within 42" of £loor. <br />slider/egress sized except do not change <br />sill height <br />casement where <br />fixed elsewhere <br />casement where <br />fixed elsewhere <br />jalousie was <br />jalousie was <br />removed, <br />removed, <br />middle slider, sides fixed/wall. off lower <br />section of each window, (see item S) <br />middle slider, sides fixed/wa11 off lower <br />section of each window, (see item 5; <br />
The URL can be used to link to this page
Your browser does not support the video tag.