Laserfiche WebLink
,-, <br />CLOSED CM WORK ORDERS REPORT j <br />Total Utility Mainte�nance Management System <br />03/07/1996 Page 1 <br />________________________________________________________________________________ <br />Date Range :O1/09/1989 - 02/7.9;'1996 <br />CM Work Order Range :1001091070001 - UT1002- - Pattern :7�01196750632 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />________________________________________________________________________________ <br />CM WORK OFDER ID: 710i196750632 Title: CONVERT 9105 9TH AVE SE <br />« P,UPLICATE PRINTING OF THIS WORK ORLER» <br />Iteci ID: WS1885L092 -- WATER SERVICE <br />Location ID: -- <br />Program '/10 Function 119 Activity 675 <br />Date Completed: 02/20/1996 <br />Overall Craft: <br />Issued: 02/20/1996 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />CraLC ID Name <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />_"" __'___ ___"__"'__"___"__'_'____'_ <br />WST BBA BRADLEY, BROCK A. <br />UL CSG CAVANAH, SHANE G. <br />SUP2 GJ GARZA, JOHN (NMI) <br />Materials: <br />ID <br />ADAP34000347 <br />ADAP34145347 <br />BOX000056247 <br />COUP34004247 <br />COUP34004347 <br />METE36089447 <br />PIPE34060647 <br />VALV34008648 <br />Vehicles: <br />ID <br />V0017 <br />Description <br />------------------------------ <br />ADAPTER 3/4" CST X INSTA-TITE@ <br />ADAPTER 3/4"MIP X 1"IFS INSTAQ <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" FIP X COP ELL @ <br />COUPLING 3/4" MIP X COP ELL @ <br />METER S/8" X 3/4" NEPTUNE T-10 <br />PIPE 3/4" POLY I.P.S. <br />VALVE METR 3/4" L/W FLARD COP@ <br />Planned Hrs Actual Hrs <br />0.00 2.00 <br />0.00 2.00 <br />0.00 1.00 <br />Total Labor Cost: <br />Date # Used <br />-------- -------- <br />02/20/1996 4 <br />02/20/1996 1 <br />02/20/1996 1 <br />02/20/1996 1 <br />02/20/1996 1 <br />02/20/1996 1 <br />02/20/1996 4 <br />02/20/1996 2 <br />Total Material Cost <br />Description Hours Cost <br />------------------ ------ ---------- <br />94 FORD AEROSTAR VAN 1.00 6.00 <br />Total Vehicle Cost: 6.00 <br />COS!: <br />34.48 <br />24.24 <br />24.46 <br />83.18 <br />Cost <br />30.36 <br />10.46 <br />12.97 <br />4.02 <br />3.83 <br />30.85 <br />1.04 <br />21.46 <br />--;:-=�=''� <br />� 114.99 <br />Work Description: <br />-------------------------------------------------------------------------------- <br />METER# 40913432 <br />