My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5725 9TH DR W 2016-01-01 MF Import
>
Address Records
>
9TH DR W
>
5725
>
5725 9TH DR W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2017 8:51:25 PM
Creation date
4/3/2017 3:02:44 PM
Metadata
Fields
Template:
Address Document
Street Name
9TH DR W
Street Number
5725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. <br />�6, <br />7. <br />( 8,, <br />9. <br />10. <br />11. <br />12. <br />13. <br />14. <br />PU{3LIC WORKS PERMIT COMMENTS <br />As per Publio Works approved plan dated <br />Connect side sewer per City Standard #601. <br />Connect side sewer per City Standard #'s 601, 602, 604. <br />Connect all rooftop downspouts to the side sewer. <br />Connect rooftop downspouts to the drainage systam provided for this lot. <br />Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br />attachment (or more details. <br />The contractor must meet with the Public Works inspector to discuss potential d!ainage <br />routing prior to beginning the project. <br />Install erosion control measures as determined by the Public Works inspeclor, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />Install erosion control measures per City of Everett Standards for small parcels <br />Remove arosion control measures upon completion of the project prior to final approval of the <br />permit. <br />All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />� <br />17 <br />install a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway from the front property line out to the street paving. <br />18. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />19. <br />20. <br />21 <br />A catch basin as per City Standard Pian #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />PVJCamments <br />�i—"/� <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.