My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8808 9TH PL W 2016-01-01 MF Import
>
Address Records
>
9TH PL W
>
8808
>
8808 9TH PL W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2017 8:48:23 PM
Creation date
4/3/2017 3:03:54 PM
Metadata
Fields
Template:
Address Document
Street Name
9TH PL W
Street Number
8808
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. Contact the Public Works Inspector (call ) to discuss the project prior to begir,ning ��+ork. <br />4. Connect side sewer per City Standard #601. <br />5. Connect side sewer per City Standard #'s 601, 602, 604. <br />6. Connect all rooftop downspouts to the side sewer. <br />7. Connect roo(top downspouts to the drainage system provided for this lot. <br />g. Rooftop runoff must be discharge�d tmate size trench�st3.5'Iwid2n2' deep and 25YIong.vSeet <br />Storm Manual 3-2.62. The app <br />attachment for more details. <br />g, The contractor must meet with the Public Works Inspector to discuss potential drainage routing <br />prior to beginning the project. <br />10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, <br />straw bales, swales, or erosion blankets. <br />11 <br />12. <br />13. ) <br />Install erosion controi measures per City of Everett Standards for small parcels <br />Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />All excavated material from foundation, sidewaik and driveways shall be hauled to an approved, <br />permitted site. No wasiing of material is allowed on this building lot. <br />� 14 � No dirt, mud, rocks or debris to be tracked onto roadway. <br />,�15.� ' No building materials to be stacked on sidewalklroadway and sidewalk/roadway to be kept clean <br />and open for pedestrian travel. <br />16. Adjust water meter box 1" above sidewalk grade. <br />�7, Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A & <br />306 on this proposal's frontage as direct�d by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />f[; <br />19. <br />Install a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway from lhe front property line out to the street paving. <br />Water District for connecting provisions for this building's water <br />Zp, Contr�ct the <br />and ��:wer services. <br />21. A ca`:h basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is required <br />fortne parking area. <br />ZZ Imanhole,rthen gravsty flow acboss thellpubllce ght of-wayne must discharge into a private <br />
The URL can be used to link to this page
Your browser does not support the video tag.