Laserfiche WebLink
PU�LIC WORKS <br />PERMIT <br />PUBLIC'NORKS DEPARTMEN7 <br />3200 Cedar Slreet <br />�f, Everen, WA 98201 <br />(425) 257-BB70 <br />OWNER NAME <br />ANDADDRESS:EV2i2tt Housing Authority <br />3107-Colby �ve <br />EVERETT WA 98201 <br />Pr+oNE: ( 425 ) 303-i103 <br />TA%PARC[LI.D.k <br />DESCRIPTIONOF Sidewalk upgrades <br />PROPOSED WORK: <br />� <br />PERMI'f CONDITIONS <br />APPLICANT NAME <br />ANCADDRESS: <br />PHONE: <br />AD�RESS: <br />Date <br />Public Wo�ks Permit d <br />Building Permit N <br />Planning Reference n <br />5/8/2000 <br />Pw0ea5-eis <br />Public Works Fee S s 25 . 00 <br />Guaramee 5 <br />Eric Sward / CNJA Arch. <br />27�2 Colby Ave Suita 60 <br />Ev�rett wa <br />(425)259-1560 <br />2909 9th st <br />h/oT fo,e 7NTE�'to,Z UFGRApES� <br />1. All calls for inspection shall be inade 24 hours in advance - phone (425) 257-8810 <br />2. All work shall be perlormed in accordance with ihis permil and current Ciry of Everett Design and Constructior� <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-8�0-424-5555 <br />4. Work shall be done Ier Plans appoved on 5-8-2000. /l�P� a.lTal%�c�, <br />L� <br />._-'/`'')`. I1 �;._'�\:� <br />.. �iVUJ��iC <br />_,T�:�„ �s.00 <br />: �-�� 2�.ae <br />ACKNOWLEDGEMENT OF CONDITIO�IS <br />7he undersigned ownedapplicant hcreby agrees to hold a�,� <br />save harmless thc Ci.ry of Everetl Irom any and all claims br <br />^_amages, costs, expenses, or causes of action that may arise <br />because of installation and maiNenance ol the improvcnient or <br />other righl-ol-way use hereto applied for and lurther agrees to <br />remove pon notice fmm the City d to replace public <br />prop d agetl thereby. ' <br />namre ol App'ican� D�-��� <br />VrORK AUTHOqIZED BY THIS PERMIT MUST BE STARTED WITHIN 100 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTEfl IS TO BE DILIGENTLY PURSUED <br />TO COM1IPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVEH 90 DAYS DURATION. <br />