My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
819 N BROADWAY 2017-04-03
>
Address Records
>
N BROADWAY
>
819
>
819 N BROADWAY 2017-04-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 3:55:46 PM
Creation date
4/3/2017 3:55:45 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
819
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 1 <br /> 3/29/2017 14:48 <br /> Issued By CSG CAVANAH,SHANE G. <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 7/20/2016 <br /> Fund 401 Account 5 Program 710 Function 119 Activity 675 <br /> Program <br /> Title RENEW 2 INCH 819 N BROADWAY 710119675 <br /> Work Order No 20161906 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 7/20/2016 Time 13:09 Original WO Billing <br /> Customer Information <br /> Customer Name Customer Id <br /> Address Street <br /> Apartment No City <br /> State Zip <br /> Subdivision Change Map Y/N <br /> Phone No ( > Ext <br /> Second Phone ( ) Ext _ <br /> E-Mail Address <br /> Problem Information <br /> Address 819 Street BROADWAY <br /> From Cross Street <br /> To Cross Street <br /> City Zip <br /> Subdivision Map Book Map Reference <br /> Problem <br /> Sub Problem <br /> Requested By Date Requested <br /> Agency Related Request <br /> Initiated From <br /> Utility Locate (USA) No Called Date Expiration Date <br /> Assignment Information <br /> Dept Priority Estimated Hours <br /> Crew <br /> Contractor <br /> Assigned To <br /> Assigned By <br /> Assigned Date To Be Comp Date <br /> Scheduled Date Scheduled Time <br /> Route Route Sequence <br /> Comments <br /> Action Taken RENEWED SERVICE. ELIMINATED GALVANIZED PIPE AND INSTALLED POLY WITH NEW 2-INCH <br /> HEAVY DUTY GATE VALVE WITH SETTER <br /> INVENTORY MATERIAL IN THE AMOUNT OF 1868.96 WAS JOURNALIZED IN 2016. <br /> CLOSED PER PEREZ,SERGIO <br /> Recommended Action <br />
The URL can be used to link to this page
Your browser does not support the video tag.