Laserfiche WebLink
PORT OF EVERE7T SECTION 00700 <br /> 127H SI'R[E'I JI:�RINA— VOLL`�IE 1. �l��ItiAE R'ORK GENERAL CONDITIONS <br /> ll.5 Correction or Remuv:d o(Dc(ccti��e\1'ark <br /> If required by ENGINEER, COIv�'RACTOR shall promptly, without cost to PORT and as specified by <br /> ENGINE-EI2, eidicr cortect any defective �Vork,u�hether or not fabricated, installed or completed,or, if the <br /> Wbrk has been rejected by ENGINEER,remove it trom the site and replace i[�vith nondefecti�•e Work. <br /> 11.G Acceptancc of Dcfcctivc Nork <br /> If,instead of requiring cortection or remo��al and replacement of defectie�e R'ork, PORT(and. prior ro <br /> ENGII�'L-L-R's reconmiendation oCfinal pa}�ment, also ENGIIv`L-ER)preCers to accept it,POR�f ma}•do so. <br /> In such case, if acceptance occurs prior to LNGINEER's recommendation of final payment,a Change Order <br /> shall be issued incorporating the necessary revisions in die Contract Documents, includin�appropriate <br /> reduction in the Contract Price;or, if[he aceeptance occurs after such recommcndation, an appropriate <br /> amount slmll be paid by CONTRACTOR to PORT. <br /> 11.7 PORT A1a}' Correct Defcetive�1'ork <br /> If CONTRACTOR fails within a reasonable time after��ntwn notice of LNGII�LLR to procced to con�cct <br /> and lo correct defective\Vork or to rcmove and replace rejectzd\Vork as required by ENGINEEF,in <br /> accordance with para�raph 11.5,or if COIQTRACTOR tSils ro perform dre R'ork in accordance with thc <br /> Contract Docume�ts(including any requiremenls of the progress schedule),PORT may,after seven(7) <br /> days'wrinen notice to CONTRACTOR,correct and remedy any such deficiency. In exercisinp its riehts <br /> under Ihis paragraph PORT shall proceed expeditiously. To the extent necessary to complete corrective and <br /> remedial action,PORT may exclude CONTRACTOR from all or part of the site,take possession of all or <br /> pan of the 1Vork, and suspend CONTRACTOR's services related thereto,take possession of <br /> CON'rRACTOR's tools, appliances,canswction equipment and machinery at the site and incorporete in <br /> 4�e Work all materials and equipment stored m the site or for u�hich PORT has paid CONTR�CTOR bu[ <br /> which are s[ored elsewhere. CGDITR4CTOR shall a!low PORT, YORT's representatives, agents and <br /> employees sucL acccss ro t6e site as may be necessar�to enable YOI2T to exercise its riehts under this <br /> paragraph. .411 direct and ind'ucct costs ef PORT in excrcisin:such rights sl�all be chareed a�ainst <br /> CONTRACTOR in an amount verificd by LNGINEER,and a ChaneP Order shall be i,sued incorporating <br /> the necessary revisions in du Contract Documenu and a reduction in[he Contract Price. Such direct and <br /> indirect costs shall include, in panicular but�eid�out limitation,compensation for additionaf professional <br /> services required and afl cosu of repair and replacement oFwurk of others desvoyed or d�maeed by <br /> coaection,remo�al or replacement of CONTR4CTOR's defectice�Vork. CONTI2ACTOR shall net be <br /> allowed an cxtension of the Contract Time because of any delay in pedommncc of the Nork attributable to <br /> die exercisc by PORT of PORT's rights hereunder. II <br /> [ND:1R1lCLL Il <br /> 00 i 00 - 54 <br />