My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
>
Address Records
>
11TH ST
>
607
>
12TH ST MARINA
>
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 2:52:09 PM
Creation date
4/4/2017 7:30:59 AM
Metadata
Fields
Template:
Address Document
Street Name
11TH ST
Street Number
607
Tenant Name
12TH ST MARINA
Notes
VOL 1 & 2 - UPLAND WORK PROJECT MANUAL & HALF SIZE PLANS APPROVED
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT SECTION 00 i00 <br /> 1?T�{STREET bIARINA—�'OLUM1IE I: 1�1r1RINf: �VO��}: GENER4I.CO;VDITIONS <br /> 12.�.2 EVGINEER's recommendation of any pa}�ncnt reque,ted in an Application for Pa}Tnent n•ill <br /> constimte a representation by ENGINL-ER ro PORT,based on ENGIA'EER's or.-site obsen�ations <br /> of[he N'ork in progress as an experienced and qualified desicn professional and on ENGI\'E-ER's <br /> reciew cf the Application for Ya}�nent and thz accompanying data and schedules that[he�'�'ork has <br /> progressed to tlie point ind�cuied; dia[, to the besl of ENGIIQELR's}:nou�ledge, informa[ion and <br /> belief,the yuality oF die\Vork is in accordance uith t!�e Contract Documents(subject to an <br /> evaluation of the Nork as a functionine Project upon Substantial Completion, m the results of any <br /> subsequcnt[ests called for in the ConVact Documents and any qualifications s;ated in Q�e <br /> recommendationj and that CONTRAC?UR is entitled to payment of the amount recommended. <br /> However,by recommending an}�such payment ENGINEER will not have ascertained how or for <br /> �vhat purpose CONTItACTOR has used the moneys paid or to be paid to CONTRACTOR on <br /> account of t1�e Contract Price,or that ti�le to any Work,materials or equipment has pnssed ro <br /> PORT free and clear of any Liens. <br /> 12.�.3 L'NGINELR's recoaunendation of final pa}m�ent�eill constitute an additional representation by <br /> ENGINLLR to PORT thal[he condi[ions precedent ro CONTRACTOR's beine entided to final <br /> pa}ntent as set fortl�in paragrap6 i 29 have been fulfilled. <br /> 1'_'.�.4 ENGINEER ntay rcfuse to rrcor.�mend die whele or any part of any p�yment if, in his her opinion. <br /> il��-ould be incorrect to make such represent�tions to YORT. He�she ma}•also rcfuse to <br /> recommend auy such pa}'ment,or,because of suUsequently discovered ecidence or the results of <br /> subsequent inspections or tests,nullify and such pa}�nent previoush�recortunended to such extent <br /> as may Ue necessary in LNG[1VEER's opinion to protect PORT Gom loss because: <br /> a. tlre Nork is defccti��e, or completed Work has been damaged requiring cortection nr <br /> replacement, <br /> b. «Titten claims have been made against POR7'or Liens have been filed in connection wiAi the <br /> Work, <br /> c. the Contract Pnce has been reduced because of blodifications, <br /> d. POR7' has been required to correct defecti��e 1Vork or complete the R'ork in accordance��ith <br /> paracraph 11.7, <br /> e. oCCONTRACTOR's unsatisfactory prosecution of die��brk in accordance«ith the Contract <br /> Documents, <br /> C CONTR4CTOR's tailure�o nmke paytnent to Subcontractor, or for labor,materials or <br /> equipment,or <br /> g. of quantity adjusUneni or correction. � <br /> 12.G Substantial Completion <br /> 12.6.1 P✓hen CONTR4CTOR considers the entir� \b'ork rzadv for its intznded use CONTR4CTOR <br /> shall,in wriU ig tn PORT and ENGNLER,cenify tha[the entire\\'erk is substantially complete <br /> and reques[tnat ENGINELR issue a Certificate of Subsiar.tial Completiun. �Vithin a reasonable <br /> time thereafrer,PORT,CONTR4CTOR and EA'GIiJEER shall mal:e an inspection of the Mork ro <br /> det�m�ine the status of complztion. If ENGINL-ER does not considcr the\1'ork substantially <br /> complete, LNGPIL-ER�sill notifi�CONTRACTOR in�«icine Ficing his�licr reasons therefore. If <br /> ENGI�ILER considers the\\'ork substantialh�complete,L-NGP.VEER will prepare and deliver to <br /> PORT a tentative Cenificate of$ubstantial Complztion which shall fi.r the date of Substantial <br /> Completion. There shall be attached to the certiticate a temati�e lisc(punch list)of items to be <br /> wmpleted or corzected before fit�al pa}�nent. PORT shall have seven days afrer receipt of the <br /> tanta;ivc cenificate during ti�'hich it may make«Tittzn objection ro ENGP.VELR as ro any ' <br /> provisions of tl�e cenificate or attached list. If, after considerine such objections,FNGNEL•R <br /> concludzs that the�1'ork is not substan[ially complete, ENGINEER will��ithin founeen(14)days <br /> after submissior.of tl�e tentativz certific�te to PORT notify CO?vTR4CTOR in uritin„stating <br /> his'hcr rc�sons d�ereforz. It,afier con�ideration af PORT's objections,ENGINEER considers the <br /> 00?00 -56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.