Laserfiche WebLink
PORT OF EVEitET" SLCTIO\'00?00 <br /> 127N STKEET bi_ARINA— VOLIJbIE 1: bIA12INE WOTCK GE'v'ERAL CONDITIONS <br /> r�I2TICLL 13 SUSPLNSION OF�1'ORK Pu\D TEILIII�AT10\ <br /> 13.1 Suspcnd thc�Vork <br /> POR"I may,at any tim�and without cause,suspend the\�'ork or any portion thereof for a period ef not <br /> more than thirty(30) da}'s by notice in wnting to CONTRACTOR and LNGINEL-R�ehich shall fix the date <br /> on�shich�Vork shall be resumed. CONTRAC"IOR sh�ll resume the Work on the date so fixed. <br /> CONTRACTOR«ill be allowed an increase in the Contract Price,or an extension of the ConVact Time,or <br /> both, d'ucctly attributable to �ny suspension if it makcs a daim therefore as pro�id�d in:lrticic 10. <br /> 13.2 PORT\Iay Tcrminatc <br /> 132.1 lJpon the occurrence of nny une or more oC the follo�ti�ing e��ents: <br /> a. if CONTRACTOR is adjudged a hankrupt or insolcent, <br /> b. if CONTR4C?OR makes a eencral assienment for tl�e benefit of creditors, <br /> c. if a tcustee or receiver is :ippointed for CONTRACTOR or For any of CONTR.4C1'OR's <br /> property. <br /> d. if CONTR.ACTOR files a petition to take advantaee of any dcbtor's ac�,or to reoreanize undcr <br /> d�e bmilcruptcy or similar laws, <br /> e. if CONTR4C7'OR repearedly fails to supply suCficicnt sl:illed��orl:men or suitable materials <br /> or equipment, <br /> f. if CONTRACTOR repealedly fails[o make prompt pa}ments to Subcontrac[or or for labor, <br /> materials or equipment, <br /> �. if CONTR4CTOR disregards laws,ordinances,rules,re=ulations or orders of any public body <br /> l�aving jurisdiction. <br /> h. if CONTI2.4CTOR disreeards the authoriry of ENGINEER,or <br /> i. if CONTRACTOR othem:isc violates in any substantial }�'ay an} pro�isions of the Contr�ct <br /> Documents, <br /> 13.2? PORT may after�iving CONTR4CTOR and its Surery se�en(i)days'u�ritten notice, terminate <br /> the scrvices of CONTR4CTOR,esclude CONTR4CTOR from die site and take possession of the <br /> \Vork and of al]CONTRACTOR'c tools,appliances,conswction equipment and machinery at the <br /> sire and use the same to tl�e Cull extent thcy could be used by CONTR4CTOR(wid�out]iabiliry to <br /> CONTRACTOR for vespass or conaersion), incorpomte in il�e Nork al] materials and equipment <br /> stored at the site or lor uhidi PORT has paid CONTR�CTOR but which are stured elseu'here, and <br /> titush the�Vork as PORT may deem espedient. In such case CONTRACTOR shall not be entided <br /> to receive any fiirther payn�en[until die work is finished. If[he unpaid bala��ce of tlte Convact <br /> Price esceeds the dir=ct and indirect costs of completin� the\Vork, including compen�ation for <br /> additional profession�l sen�ices,such excess shall be paid to CONTRACTOR. If such costs <br /> exceed tl�e unpaid balance, CONTR4CTOR shall pay the differcnce[o PORT. Such costs <br /> incurred by PORT shall be��enfied by ENGINEER and incoiporated in a Chanee Orde:,but in <br /> finishing d�e�'�'ork POI2T shall not be required to ubtain the]owzst figure for the work performzd. <br /> 1=.?.3 1Vhere CON"IRACTOR's services have been so tertninated by PORT, the ternunation shall noi <br /> affect any nghts of PORT aeau�st CONTRACTOR dien existin;or wl�ich may thereafier accrue. <br /> .�ry retention or pa}mient of muneys due CONI RACTOR by PORT�3•ill not release � <br /> CONTR�,CTOR from liabilitv. <br /> 13?.4 Upon secen(7) days written notice to CONTR�CT�R and Ei�'GINEER,PORT may��ithout <br /> cause and«�ithout prejudice te any other right or remed} clect to abandon the Nork and terminate <br /> d�e.4ereement. In sudi case,CONTR�.CTOR shall be paid for all work zxecuted and any expense <br /> sustained plus rcasonable,emiination expenses. <br /> 00 i 00 - 60 <br />