My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
>
Address Records
>
11TH ST
>
607
>
12TH ST MARINA
>
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 2:52:09 PM
Creation date
4/4/2017 7:30:59 AM
Metadata
Fields
Template:
Address Document
Street Name
11TH ST
Street Number
607
Tenant Name
12TH ST MARINA
Notes
VOL 1 & 2 - UPLAND WORK PROJECT MANUAL & HALF SIZE PLANS APPROVED
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT 01� EVERETT SECTION OOi00 <br /> 12�{ STREET�LARIiQA—VOLIJME 1:MARINL' \VORK GENER4I,COh�ITIONS <br /> ARTICLE 14 CLAIDIS�1ND DISPCTES <br /> l�t.l Claims and Disputes <br /> 14.1.1 All claims,disputes and other matters in question be[ween P�R'I and COA'TR4CTOR arisin�out <br /> of,or rela�ing to the Contract Documenls or the breach there�f ercep[for claims which ha�•e been <br /> waived by the mal:ing or acceptance of final pa}anent as provided by paragraph 12.9,shall be <br /> decided by the laws of the State af Washingmn in the public coutt of Snohomish C^unry. <br /> 1�.1.2 No dtmand for any claim, dispute or other matter that is required to be referrerl to::NGINEER <br /> initially Cor decision in accordance u'ith paraeraph section 9.G.1 shall be made until tl�e earlicr of <br /> (a)lhe date on���hich LNGINEL-R has rendered a decision of (b)the tenth day afte� the parties <br /> have presented their evidence ro L-NGINEL•R if 1«ritten decision has not been rendered by <br /> ENGINL-LR before that date. No demand for any such claim,dispute or other matter shafl be <br /> made later than thiny(30)da}'s aftcr the date on�chich LNGINEER has rendered a untten <br /> decision in respect ihereof in accordance with paragraph section 9.6.1,and the failure to demand <br /> due process within said thirty(30)days'period shall result in ENG[DIEER's decision beino final <br /> and binding upon PORT and CONTRACTOR. <br /> LND OF ARTICLE 14 <br />� <br /> 00"00 - 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.