My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
>
Address Records
>
11TH ST
>
607
>
12TH ST MARINA
>
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 2:52:09 PM
Creation date
4/4/2017 7:30:59 AM
Metadata
Fields
Template:
Address Document
Street Name
11TH ST
Street Number
607
Tenant Name
12TH ST MARINA
Notes
VOL 1 & 2 - UPLAND WORK PROJECT MANUAL & HALF SIZE PLANS APPROVED
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P02T OF E\'ERETT SECTION OOS00 <br /> ]?T0 S7'RLr'f \-1-AI.I\A — ��OLU��1C- 1: ht:ARI\b \VORK Slii'PLE�fL\'T?.RF COVDITIUtiS <br /> lil .l Glccu'ic,il Float Plan <br /> c�.z r-�o�� .a <br /> E1.3 Float B <br /> EL4 Float C <br /> E1.5 Float D and E <br /> E I.6 Float F <br /> E1.7 Float G & H <br /> E1.8 Float I <br /> E1.10 Electrical Plan - Approach Picrs A,H, fi J;K <br /> E1.11 Electrical Plan - Approacl� Piers B/C/D <br /> E1.12 Electrical Plan - Approach Piers E/F <br /> E1.13 Security Gate Plans <br /> E1.20 Wirine Dia�Ram Sin�le Line <br /> E 1.21 Substation �4'iring Diagram— Flont A <br /> E1.22 SuUstation Wiring Diar�am — Floats B�C!D <br /> L1.23 Substation Wiring Dia�am — Floats E�F,'G <br /> F.l.24 Substation Wiring Diagram— Floats 1%J�I�; <br /> Ll.25 Float Schedules A/B/C/D <br /> E1?6 Float Schedules E/F/G/] �I <br /> E1.30 Electrical Details <br /> E1.3! F1oadHeadwalk/Substation Details <br /> L1.1 General Notes, Legend, Abbreviations, R Key Plan <br /> L1.2 Pavin�� Plan, Approach Pier A Plan Enlargement <br /> L� � Paving Plan, B-C-D and Approach Piers E-F-G Plan <br /> Enlar�ement <br /> Ll.> Paving Surface & Bollard Details <br /> L1.6 Approach Pier Guardrails Details RBollard Location Plan <br /> Teclmical Specificntions <br /> Division 1 - Genera] Requirements <br /> Section 01010 SLmmary of��'ork <br /> Section O101i Change Order and Payment Forms <br />' Section 0102� Me�surement and Pavment <br /> Section 01030 Field Engineering <br /> Section 01040 Coordination <br /> Section 01100 Altemates <br /> Section 01201 Nleetines <br /> Section Oli00 Submittals <br /> Section 01400 Quality Control <br /> Sec[ion 01500 Construction Facilities and Temporary Controls <br /> Section O1�60 Enviro�miental Controls <br /> Section 01600 �lnterials and Equipment <br /> oosoo - s <br />
The URL can be used to link to this page
Your browser does not support the video tag.