Laserfiche WebLink
PORT OF EVERE-TT ;ECTION OOS00 <br /> 12T" STItEET MARIIV:1—VOLiIbiE 1: n-IAFLINE �VORK SUPPLEntENTAR�' CONDTTI�NS <br /> Division 15 —Mechanical <br /> Section 15145 Mariva \����ter S��stcn� <br /> Section 15146 Marina Fire Systcm <br /> Section 1�d30 Marina Sewer Systeiu <br /> Division 16—Electrical <br /> Section 16050 Basic Electrical Materia]s and Methods <br /> Section 16060 Grounding and Bonding <br /> Section 16071 Seismic Controls <br /> Sec[iou 16080 Electrical Testing <br /> Section 1G120 Conductors and Cables <br /> Section 16130 Raceway and Boxes <br /> Section 16140 Wiring Devices <br /> 5ection 16362 Marina Unit Substations and Po��er Centers <br /> Section 1644=} N,arina Po«�er Pedesta] <br /> Section I6i'1 Extcrior Lighting <br /> SC-09 Lavout of the Work <br /> CONTItACTOR shall be fully responsible to layout the Work, including construction <br /> staking, centerline staking, and ocher elements of tlie Work. This shall generally require <br /> die scrvices of a surveyor hired by the CONTRACTOR to establish control points for use <br /> during construction. The POR'I'will only provide coordinates of known reference <br /> monuments existing before co!luneiicing \Vork anci �,ill ��ot pro�ide stskine or layout <br /> services to the CONTRACTOR. <br /> SC-10 Use of ApPrentices <br /> For contracts estimated to cust n;orc tha� one million dollars (S 1,000,000) for PORT <br /> public works projects, POP�T shal] require good faidi efiorts from CONTRACTOR to use <br /> �Vashingtun State Apprenticeship and Trainin� Council (�YSATC) regisrered apprentices <br /> for up to fifteen (IS°ro) of total labor hours. CONTRACTOR and Subcontractors shall <br /> make every effort to utilize apprenticeship labor from residents of Snohomish County to <br /> the extent reasonably available. <br /> Apprenticeship utilization compliance consistent widi this requirement shall be certified <br /> hy CO\TRACTOR and Subcontractors on fonns appro��ed Uy the PORT. <br /> OOS00 - 10 <br />