My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
>
Address Records
>
11TH ST
>
607
>
12TH ST MARINA
>
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 2:52:09 PM
Creation date
4/4/2017 7:30:59 AM
Metadata
Fields
Template:
Address Document
Street Name
11TH ST
Street Number
607
Tenant Name
12TH ST MARINA
Notes
VOL 1 & 2 - UPLAND WORK PROJECT MANUAL & HALF SIZE PLANS APPROVED
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� PORT OP EVERLTT SECTION 00�00 <br /> 12TH STR.6ET �1Ai2INA—�'OLli�lE 1: MARINE �VORK AGREEMENT FORM <br /> � <br /> � PORT OF EVERET"C <br /> � THIS AGREENIENT is dated as of tl�e day of in the year <br /> 200� by and betwecn the Port of Everett (hereinafrer called PORT) and <br /> PURT and CONTRACTOR, in consideration of the mutual co��enants hereinafter se� forth, aeree <br /> ias follows: <br /> ARTICL� 1 - NOR3� <br /> 1 The Project has been desiened by PtiD, [nc. <br /> ( CONTRACTOR shall complete nll Work ns sp�cified or indicated in the Contracs Documcnts. The <br /> � Work is generally described as follows: <br /> � This praject consists of all marine �vork r.ece�sary for the ne« I�'h Street viarina. <br /> Specific items of work include demolition of ezisting marine structures; dredeing <br /> � and disposal of approximatcly 230,000 cubic yards of sediments suitab!e for open- <br /> �vater; approximatcly 3,�00 lineal fect oi rack shore prctection sunounding the <br /> basin; construction of a new haid-out pier and floating docks; renovation of an <br /> , existing wharf into a Travelift pier with floating docks; construction of four pile- <br /> � supported approach piers and gang���ays; construction ef a new floating transient <br /> moorage dock; and construction of a new Z40 slip marina, including fumishing <br /> � and installing floating docks, guide piling, and utilities. <br /> The pier structures for this project are comprised of precast/prestressed concrete <br /> � deck panels supported by steel piles and pile caps. The fabricator-desimed float <br /> � systeni consists of approximately 81,000 square feet of concrete monolithic floats <br /> anchored with galvanized steel pipe piles. The eieht aluminum gangways are <br /> f fabricator-designed to meet the project requirements. <br /> I <br /> ARTICLE 2 - ENGIN�ER <br /> � The PQRT has appointed PND, Inc. as ENGiNEL-P. who shall he the PORT's representative, <br /> assume all duties and responsibilities and }iave [he riehts and authority assiened to tne ENGNEER <br /> in L'�e Contract Documents in connection with completion of the Work in accordance with the <br /> Contract T)ccuments. <br /> OOj00-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.