Laserfiche WebLink
i <br /> � PORT OF EVEF.ETT SECTIOti GO i00 <br /> 12T" STREET MARINA—VOLL7vIE ]: M.4ftlh'E«'ORK GE\'ERAL CONDITIONS <br /> � <br /> 2.5 Contracl Time <br /> � 2.5.1 T1te Contract Time�t'ill commence to run on the effective date statzd in the Notice to Proceed,but <br /> in no case shall it be later tl�an seven(7)days aCter the date oi the Notice to Proceed Icttec The <br /> � PORTwill transmit an executed copy of the.4greement to the CONTR4CTOR with the Notice to <br /> Proceed. <br /> 2.�? 7he Contract Time is that period of time allotted in the Contract Documenis, as adjusted by <br /> � Change Orders, for CONTRACTOR to achieve Substantial ancL'or Final Completion of the R�ork <br /> as raore fully set forth in[he Contract Documents. <br /> 2.�3 The term day,as uced in the Contract Documents,shall mean a calendar day unless othernise <br /> � specifically designared. <br /> 2.5.4 Substantial Completion occurs�shen the PORT can use or occupy the Nork for Qie use for which <br /> 7 it is intended, and wUen all documentstion required to opera�e thz faciliry constructed has bnen <br /> � propcdy submitted to the POF.T in accordance u ith die Contract Dnwments. Such documentation <br /> slmll include but is not necessarily limi[ed to: <br /> 1 a. hlaintenance and Operations manuals; <br /> 1 b. Warranties; <br /> c. Submittals required by the SpeciFications; and <br /> � d. Oaupancy permits and related approeals by any authority«�th jurisdiction for same. <br /> 2.SS Final Completion occurs when all requirements of the Contract Documents have becn properly ard <br /> � completely fulfilled including but not limited to: <br /> 1 a. Completion of,reinspection and PORT approval of all Funch List items; <br /> b. Submittal of final invoice and approval by il�e ENGI�IEER; <br /> � c. Subnuual of all propedy completed as-b�ilt record drawings;and <br /> � d. Submival of any other documents required by ihe Contrac[Dowments. <br /> I2.5.6 Acceptance is thc formal action of tl�e PORT Commissian accepting the\bbrk as complete. <br /> I Acceptance is required Cor contracts greater tl�an S 100,000. <br /> 2.SJ Proeress and Completion <br /> ! a. AL' time limits stated in the Couvac�Documents are of the essence of this Convact. <br /> b. The CONTRACTOR shall begin[l�e N'ork on the date indicated in the Notice w Proceed as <br /> set forth in dtc Supplementary Conditions and shall dilieently prosecute the�'�'ork���th <br /> ' adequate equipmen[and Corces in order to bring the\�brk to completion within the Convact <br /> ' Time. <br /> 2.6 Gxten�ion o(1'imc <br /> .4ry extension of Contract Time must have the ��ritren approval of the PORT ia the form of a Chanee <br /> Order. <br /> In event of delay in completion of the\4'od:caused by acis of God,or the public enemy,or another <br /> contracror in[he perfortnance of a conlract��7th d�e PORT,or caused by fires, tloods,epidemics, quarantine <br /> � restrictions,stnkcs,freight entbargocs or tveather,tSe sole and exclusive remedy of the CONTR�CTOR <br /> will be an equitable e�tens�on of time allowcd for completion. <br /> I 00%00 - 1� <br /> I <br />