Laserfiche WebLink
� FORTOFEVL-RETT SECTIONOOi00 <br /> l'_j1° �CIttiET hL4RIN:1—VOLlitiIE 1: �1.4RitiE��'C�R}: GF�IER4I. CONDITIONS <br /> � <br /> � �.73 1�'ithin five(�)dups a&er the effective date of the Notice to P:oceed aed prior[o start uf work <br /> (unless othenvise specified in d�e Gcneral iLequirementsj, CO:VTRACTOR shall submit to <br /> ' ENGINEER ior re�•icw�preliminary schedule of the ealues'oCthe work. Each bid item shall be <br /> broken down to its basic elements. Th=,cost breakdoun for both lump sum and unit price <br /> � estimates shall include: <br /> a. Labor <br /> b. Ma�cnals <br /> � c. Equipment <br /> d. O��erl�ead,profit and ta::es <br /> I e. Other facrors <br /> £ Time required <br /> 2.Z4 Portions oCthis project which may be mx esempt under�VAC 453-20-171 are noted in the <br /> j Supplemental Conditiovs. The schedule of value.s shall be fom�atted as indicated in para��raph <br /> � section 2.73 lo separate d�ese items clearly. <br /> 4 2.7.� Before any Work at the site is started,CON7 R4CTOR shali delicer to PORT certificates of <br /> insurance and other evidence of insurance requested by POR'C which CONTRACTOR is rcquired <br /> to purchase and maintain in accordance with paragraph 53. <br /> i2.8 Preconstruc[iou Con@rcnce <br /> Within seven(7)days aHer tUe effective date of the Agreement,but before CONTRnCTOk starts the\\'erk <br /> � at the site,a conference will be held for re��iew of the schedules to establish procedures for Uandling�hop <br /> Drawines and oA�er submittals,Cor processing Applicatinns for Payment,and ro establislt a worl:ing <br /> � understanding among the pan�es as lo the Nork. <br /> IEND:\RTICLE 2 <br /> i <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> ! <br /> I <br /> � <br /> I <br /> ` 00?00- 17 <br />