My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
>
Address Records
>
11TH ST
>
607
>
12TH ST MARINA
>
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 2:52:09 PM
Creation date
4/4/2017 7:30:59 AM
Metadata
Fields
Template:
Address Document
Street Name
11TH ST
Street Number
607
Tenant Name
12TH ST MARINA
Notes
VOL 1 & 2 - UPLAND WORK PROJECT MANUAL & HALF SIZE PLANS APPROVED
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i'ORT OP E-VL-RL-TT SECTIOti OOi00 <br /> 12�"STREET DI:�RINA—VOLU1�fE I:bG1RINE\VORK GENER4L CONDITIONS <br /> 6.li? During the progress of the Nock,CONTR4CTOR shall keep the premises Gee &om <br /> � accumulations of waste materials, rubbish and other debris resulting Gom the Work. At the <br /> completion of the Work COIQTRAC7OR shal]remove al]waste materials,rubbish and debris from <br /> and about[he premises as well as all tools, appliances,conswctioe equipmen[and macliinery, and <br /> surplus materials,and shal] leave die site clean and ready for occupancy by PORT. <br /> CUNTRACTOR shall restore to[heir originaf condition those portions oCtlie site not desi�:ated <br /> for alteration by the Contract Documents. <br /> 6.13."s CONTR4CTOR shall not]oad nor pcanit any pa:t of any swcture to be loaded in any manner that <br /> will endanger the sWcture,nor shall CON'IRAC1'OR subject any part of the 1L'ork or adjacent <br /> properiy[o stresses or pressures Ihat�vil]endanecr it. <br /> 6.1�1 Record Ducumcnts <br /> 6.14.1 CONTR4C7'OR shall keep one record copy oCall Specifications, Dra�eines,Addenda. <br /> Modifications, Shop Drau�ings and samples at the sitc, in good order and annotated to sho�a all <br /> chances made durine the construction process. These shall be a�ailable to ENGINEER for <br /> examination and shall be dclivered to FNGINEER for PORT upon completion of the\1'ork before <br /> final pnyment is made. <br /> G.7� Stdcly�nd Protcction <br /> 6.1:i.� CONTItACTOR shall bc resnonsible for initiating,maintaining and supenising all safety <br /> precautions:nd programs in connection tvith the Work. CONTR4CTOR shall take all uccessary <br /> p:ecautions for the safety oF,and shall provide the necessary protection to preven[damage, injury <br /> or loss to: <br /> a. Al]employees on d�e Nork and other persons who may be affected therzby. <br /> b. All the�Vork and all materials or equipment to be incorporated d�erein,whetlter ui storage on <br /> or off tl�e sitc,and <br /> c. Other property at U�c site or adjacent the:eto, includin�vege[ation,wal}-s,pavements, <br /> road��ays,swcmres and utilitics not dcsi�natcd for remo�al,relocation or replacement in the <br /> cours�of conswction. <br /> 6.1�? CONTILqCTOR shall comply with all applicable laws,ordinances,ntles,regulations and orders uE� <br /> any public body havine junsdiction for the safety of persons or property or to protect them from <br /> damagc, injury or loss; a��d shall erect and maintain all necessary safzcuards for such safety and <br /> protection. CONTR4C"COR shall notify owners of adjacent property and utilities when <br /> prosecution of Uie Nork may affect Ihem. All damaee,injury or loss ro any propeny referred ro in <br /> paragraph section 6.15.1 caused,directly or indirectly,in whole or in pan,by CONI'R.4CTOR. <br /> am�Subconvactor or anyone directly or indirectly employed by any of diem or anyooe for uhose <br /> acts any of them may be]iable,shal]be remedied by CONTR�.CTOR(except damage or loss <br /> attributable to the fault of Dra«in�s or Specifications ar to d�e acts or omissions of PORT or <br /> ENGINL-ER or anyonc emploqed by either oi them or anyone for whose acts either of them may be <br /> ]iable, and not atLnbutable,directly or indirecdy,in whole or in part,to the fault or neglieence of <br /> CONT24CTOR). CONTR4CTOR's dueies and responsibilitizs for the safery and protection of <br /> the�4'ork shall continue until sucl�time as all die Work is completed and ENGINEER has issued a <br /> notice to PORT and CONTR.ICTOR in accordance��idi paraeraph L.10 that the Wor}:is <br /> acceptable. <br /> 6.15.3 COIv'TR4CTOR shail designatr a respo��sible member of iu urganization at the site whose dury <br /> shail be the prevention of accidents. Tliis person shall'�e CONTRACI'OR's supenntendent unlzss <br /> otheneise desienated in tvnune bv CONTR.4CT03'i to PORT. <br /> 00?00-=0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.