My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
>
Address Records
>
11TH ST
>
607
>
12TH ST MARINA
>
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 2:52:09 PM
Creation date
4/4/2017 7:30:59 AM
Metadata
Fields
Template:
Address Document
Street Name
11TH ST
Street Number
607
Tenant Name
12TH ST MARINA
Notes
VOL 1 & 2 - UPLAND WORK PROJECT MANUAL & HALF SIZE PLANS APPROVED
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETI SL-CTION 00700 <br /> �,rx STREET M.4RINA—VOLU:�4L 1: MARI�+E R'ORK GENER4T.CONDITIGNS <br /> 9.7 I.intitalions on ENGI�EGR's Rcsponsibili�ies � <br /> 9.7.1 T'either ENGINEER's authority to act under[itis Artide 9 or elsewhere in the Contract Documents <br /> nor any decision made by ENGINL-ER in good faith either to exercise or not exercise such <br /> �uthuriry shall give rise ro any duty or responsibilit;of ENGINEER to CONTRACTOR, any <br /> Subcontractor,any manufacWrer, fabricator,supplier or distributor,or any of[heir agen�s or <br /> emoloyecs or any otl�er person perfortning any oF the\Vork. <br /> 9.7.' Whenevcr in the Contract Documents the tenns"as ordered", "as dirccted", "as required", "as <br /> allowed" or terms of]iY.e effect or import are used,or the adjec[i��es"reasonable","suitable", <br /> "acceptaUle", "proper" or"satisFactory" or adjectices of like effect or import are used,to describe <br /> requircmei�t,direction.rcview or judgment oC ENG1T`EER as to the Work, it is intended that such <br /> requirement,dircction,review orjudgment will be solely to evaluate the 1\'ork Cor compliance with <br /> the Co�tract Documents(unless tliere is a specific statenrent indicatine othzrn�ise). 7'he use oCany <br /> such ternt or adjectivc never indicates t6at ENGIi�TEER shall have authoriry to supervise or direct <br /> performance of the Work or authoriry to undertake responsibility contrary ro Ihe provisions of <br /> paraemph scctions 9.7.2 or 9J3. <br /> 9J3 ENGINEER will not be respcasible Cor CONTRACTOR's means,methods,techniques,sequences <br /> or procedures of conswction,or the safety precautions mid programs incident themto,aod <br /> L-NGINEER will not be responsible for CONTRACTOR's failure to perform the Work in <br /> accordance with the Contract Documents. <br /> 9J.�3 ENGINEER will not be responsible for the acts or omissions of CONTR4CTOR or of any <br /> Subcontractor,or of the agents or employees oCany CONTRr1CTOR or Subcontractor <br /> CONTRACTOR, or of any other persons at the site or othern�ise perfonning any of[he�Vork. <br /> ').8 rlmending :md Supplementing Contract Doatments <br /> l7re Contract Documents may be amended to provide for additions, deletiuns and revisions in the work or to <br /> modify the tem�s and conditions thereof in one or more of the follo��ing ways: <br /> a. Pormal writren amendment. <br /> b. Change Order,or <br /> c. Work Directive Changc <br /> 9.) k�aucsts (or Instructiun <br /> Due to the higltly variable namre oCtlie materials and facilities encountered widiin the sitq the <br /> COi�1TRr�CTOR�cill require inswctions Gom the ENGINEFR as nea'areas are uncovered or exposed by <br /> thz work in proere>s. In Qte event th�t the CONI'R4CTOR requests such instructions in order to comply <br /> with the Contract requiremenr, tlie ENGINEL-R«711 provide the inswctions in writing,within fom-zi�ht <br /> (4S)hours. During d�e QS-hour penod,no additional pavments will be made to the CONTRr1CTOR for <br /> equipment, labor, or any other item related ro che request for inswctions. <br /> In additiun, the requirements of d�e Convact Document�z map be supplzmented, and minor variations and <br /> deviations in the work may be attthorized,in one or more of the toilowing«�ays: <br /> a. ENGI�IEER may auiliorize minor vanations i�che work from the rcquirements of the Contract <br /> Documents wt�icl�do not imoh�e an adju;tr,�znt in the Contract Price or the Convact Time and are <br /> consistent wid�the oeerall intent oCthe Convact Documents. These may be accomplisl�ed by a Field <br /> Order and���ill be bindine ou P02T, and also on CONTR4CTOR who shal:pedorm the work <br /> imohed promptly. If CONTR4CTOR believes that�Field Orderjustifies an increase in the Con�ract <br /> 00 i 00-46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.