Laserfiche WebLink
PORT OF EVL-RETT SECTIOi:0070� <br /> 12T" STRbE"I h(ARINA—VOLUME 1: DIARINE�VOitK GENLR•1L COA'DITIONS I <br /> :\RT[CLE 10 CB:1,\'GES IN THE R'ORK <br /> 101 Ch:uige Ordcr <br /> 10.1.1 �'�'ithout invalidating the.�.creement.POF.T ma}, at any time. order zdditions,deletions or <br /> recisions in the l4'ork; these will bc aud�orized by Chan�e Orders. <br /> 10.1.% If the CONTIL4C1'02 belie��es that completion of the pro��isions included in a Change Order <br /> justifies a change in the Contract Price it shall submit ro the PORT prior to execution of the <br /> pro�•isions oC the Change Order ics estima[ed cost for wmpletion of the Citanee Order, and shall <br /> uiclude wid�its submittal such i�forn�ation necessary to substantiate the request for a change in the <br /> Contract Price. If the request for a change in the Contract Price is not accepted by the PORT, <br /> POR7'may require fiirther substantiatine material from the CONT[L�CTOR, may�viti�draw the <br /> Change Order or may direct the CONTR.4CTOR to complete thc\Vork on a force accoum basis. <br /> Pa}ment for force account�t�ork sliall be as determined by thz conditions specified in Article ]0. <br /> ]0.13 All such\Vork shall be executed under the applicable conelitions oCthe Convact Dowments. <br /> I0.1.4 ENGINEER may auLiorize minor changes in the Nork which are co�sistent�ci[h the overall intent <br /> ef the Contract Dowments. Tl�cse may be accomplished by a Field Order and shall be bindine on <br /> PORT,a��d also on CON'rILaCTOR who shall pedonn the change prompdy. <br /> 10.1.� Additional�Vork perfomied widiout authorization of a Clianee Ordcr will not entitle <br /> CONTRr1CTOR to an increase in the Contract Price or an extension of the Contract Time. <br /> 10.1.6 CONTR.ICTOR may requesl a Change Order to reflect mediGcations to tUe�\'ork resulting from <br /> unforesecn sitc conditions. If LNGINE-ER determines that such unforesecn site conditions require <br /> a modification af d�c�York,LNGINEER�aill prepare a Cliange Order tor exewtion by PORT <br /> inco�orating such modification,as nece>sary to proceed with and complete the\Vork. The <br /> CONTRACTOR shall be responsible for reallocation of its work force when�eerk cannot be <br /> continued in an area due to unforeseen conditions. Li ao event��ill the PORT reimburse the <br /> CONTRACTOR for charges caused by delays unless prior«ritten authorizatioi�is provided by the <br /> PORT. <br /> 101 Contract P:icc <br /> .U.^_.1 The Contract Price constitute.; the total compensatior,(subject[o aud�orized adjustments)payable <br /> to CONTRACTOR for perfomiing he work. All duties,recponsibilities and oblieations assiened <br /> to or undertaken by CONT24CTOR shall be�t its expense«'i!hout change in tl�e Contract Price. <br /> 10'? The Contracl Price may only be chan,ed by a Cha�ee Order executed by the PORT and <br /> i CO�tTR1CTOR,or by a force account directive issued by PORT. No ottier circumscance(except <br /> as indicated in paraer�pU s�ction(.37.1 and paraeraph 13.1)shall be construed as the basis for a <br /> change in the Contract Pnce. <br /> 10?3 7'he calue of any\Vork covered by a Ch�nge Order or force account directi�e shall be deterniined <br /> :n one o£the follo�ving w�ys: <br /> a. �Vhere tUe work invol�ed is covered by unit prices wmainzd in tl;e Convacc Documents,by <br /> application of the unit prices to the quantities involved. <br /> b. I3y mumal acceptance of a lump sum. <br /> c. On the basis of d�e Cos[of the R%ork(detennined as provided in paragraph 103)plus a <br /> CONTRACTOIt's Fec for overhead and proti[(determined as provided in para�raph 10.4). <br /> 00700-43 <br />