My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3121 8TH ST AB 2016-01-01 MF Import
>
Address Records
>
8TH ST
>
3121
>
3121 8TH ST AB 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2017 8:17:36 PM
Creation date
4/4/2017 7:31:30 AM
Metadata
Fields
Template:
Address Document
Street Name
8TH ST
Street Number
3121
Unit
AB
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. Connecl side sewer per City Sl2ndard #601. <br />5. Connect side -ewer per City Standard #'s 601, G02, 6Gd. <br />6. Connect all rooftop downspouls lo the side sewer. <br />7. Connect rooftop downspouts to the drainape system provi:��d for tl�is lot. <br />8. Rcoflop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br />Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br />more datails. <br />�2 The contractor must meet with ihe Public Works Inspector to discuss potential drainage routing prior to <br />' beginning fhe project. <br />� �'; <br />11. <br />��' <br />13. <br />l 14. <br />i 1 v. ; <br />1G. <br />17. <br />21 <br />22 <br />Insfall erosion control measures as determined by tne Public Works inspector, such as silt fence, stra�.v <br />bales, swales, or erosion blankets. <br />Install erosion conlrol measures per City of Everell Slandards for small parcels <br />Rumove erosion conlrol maasures upon completion of the projecl prior to final approval of the permil. <br />All excavaled malerial from foundation, sidewalk and driveways shall be hauled to an approved, <br />permilled site. No wasling of material is allowed on this building lot. <br />No dirt, mud, rocks or debris to be tracked onto roadway. <br />No building malerials lo be slacked on sidewalks and sidew-alks to be kept clean and open for <br />pedesirian travel. <br />Adjust water meter box 1" above side.valk c�rade. <br />Reriove and replace curb, gutter and sidewalk as per City of Everett Standard Plan tt's 305A & 306 on <br />this proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />Inslall a Type I concrete driveway per City oi Everelt Standard #307. <br />Pave driveway from the front property line out to the stree! paving. <br />Contact the _ <br />sewer services. <br />Water Dislrict (or connecting provisions (or lhis builcir,g's vrater �nd <br />A calch basin as per City Standard Plan 1t402 with a gas Irap per Standard Plan #4 �0 is required for lhe <br />parking area. <br />If a sewer pump system is lo be inslalled, the pressure fne must discharge into a private manhole, then <br />gravity flow across the public right-of-way. <br />23. A sprinkler system is required for tliis building in compliance with the requireinents of NFDA Standards <br />13D. <br />=,�_'�� 1�l �- �z= r'���'.�;�_ Fr:<�z.J ��?�� i1-l�.r��i .D/'��nJ - c %- 7`�ytlk� <br />a,!r,:,,����.�,i; � <br />`r 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.