My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10009 12TH AVE SE 2016-01-01 MF Import
>
Address Records
>
12TH AVE SE
>
10009
>
10009 12TH AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 7:36:03 AM
Creation date
4/4/2017 7:35:55 AM
Metadata
Fields
Template:
Address Document
Street Name
12TH AVE SE
Street Number
10009
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y Duct testing Calculator {New Construction) � � � ' ��� <br /> At Rough-in (Total Leakage) • � <br /> a <br /> CFN of 1 Calculated Test2 a <br /> Home Standarcl Target CFMZS O <br /> a� <br /> � <br /> Air Flandler Present <_ 6 CFM�; per 10u sf of CFA � <br /> � <br /> Air Handler not Present <_ 4 CFMZS per 100 sf of CFA v <br /> — c <br /> C <br /> -a <br /> P�st Construction � <br /> � , <br /> CFA of 1 Calculated Test2 x <br /> w <br /> Home Standard Target CFMZS o <br /> � <br /> _ � <br /> Air Handler Present J °J <br /> (Total Leakage) `�`��� � 8 �FMZS per 100 sf of CFA ZC�"�� l � J � <br /> � <br /> � <br /> Air Handler Present � <br /> <_ 6 CFMZS per ].00 sf of CFA � . <br /> (Leakage t� Exterior) �+ <br /> � <br /> — _ <br /> Air Handler not Present <_ 4 CFMZS per 10C3 sf of CFA v <br /> — z <br /> 1. Test results must comply with one of the Standards options. v <br /> 2. Test CFMZS must be equal to or less than the calculated target. ~ <br /> Air Leakage testing Calculator (Blower poor Test) <br /> ' Standard �FA of Tested CFMso Test Result <br /> Home <br /> <0.00030 SIA <br /> ��CFMSoX 0.055)/(CFA X lA4j� �- <br /> �;5 2S ����_, D`l`1S I > <br /> Glossary ! v � / � <br /> Rou�h-In: After installation of th� complete air uistribution system but before installation of insulation and sheet <br /> rock. Allows for access to all duct seams and connections for re-eval��tion of seal integrity i�standard is not met in <br /> intitial test. <br /> Post Construction: At or near final inspection. The home must be complete enough to pressurize the home to 25 <br /> pa. <br /> Total Leakage: Aggregation of the entire systems duct leakage in a duct test. <br /> Leakage to Exterior: Aggregation of all duct system leaks to the exterior of the CFA in a duct test. <br /> CFA: Conditioned floor area <br /> CFM25: Cubic feet per minute of air leakage at 25 pascals of pressure <br /> CFMSp: Cubic fzet per minute of air leakage at 50 pascals of pressure <br /> Pascal �pa): Unit of pressure — <br /> SLA: Specific leakage area �7 `�L�� �j� <br /> �poo� I � � <br /> �or j7 z-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.