Laserfiche WebLink
CITY OF EVERETT <br />2016 To 2021 Six-year Transportation Improvement Program <br />Interstate <br />1. I-5 / Downtown Everett Interchange Access Improvements <br />(Everett Ave. Hewitt Ave., US 2, Pacific Ave) <br />2. I-5 / 100th Street SE HOV Access/Undercrossing <br />3. NB Everett Mall Way / SB I-5 Onramp <br />4. I-5 / Smith Island Interchange (12th St. or SR 529) <br />5. I-5 / East Marine View Drive Interchange Improvements <br />6. I-5 HOV Lanes (US 2 to SR 528) <br />7. I-5 / 128th Street Interchange <br />8. I-5 / 128th Street HOV Ramps (Mariner Park & Ride) <br />9. I-5 / 112th Street Interchange Study <br />Freeways <br />1. US 2 Improvements (I-5 to SR 204) <br />2. SR 526/ Hardeson Road Interchange <br />3. SR 526 Extension (I-5 to US 2) <br />4. SR 526/Evergreen Way Interchange <br />5. SR 529/Smith Island Ramps <br />6. SR 526/40th Avenue W. Intersection Improvements <br />Principal Arterials <br />1. W. Marine View Dr./Rucker/41 st Freight Route Improvements <br />2. Broadway Bridge Replacement (Bridge #529/5a) <br />3. Broadway Corridor Improvements (SR 529 to SR 526) <br />4. SE Everett Mall Way (SR 99 to SR 526) <br />5. Arterial Safety Projects <br />6. Evergreen Way Improvements (41St St. to Gibson Road) <br />7. Evergreen Way Streetscape Improvements <br />8. I-5 to Port of Everett Truck Route <br />9. Mukilteo Blvd. Safety Imp. (Friday Ave. to City Limits) <br />10. Arterial Needs Study <br />Minor Arterials <br />1. 116th Street SE Street Improvements (SR 527 to 35th) <br />2. 100th Street SW Street Improvements (4th Ave. W. to Airport) <br />3. Casino Rd. Safety Improvements (Evergreen to 5th Ave.) <br />4. 4th Avenue West Improvements (104th to 112th) <br />5. 100th Street SE Improvements (SR 527 to 7th Ave SE) <br />6. 100th Street SE Improvements (7th Ave to Evergreen) <br />7. 110th Street SE Improvements (SR 527 to 35th St.) <br />8. Lenora St./Lowell-River Rd./BNSF Rail Line Xing <br />9. Minor Arterial Streetscape Improvements <br />Collector Arterials <br />1. East Everett Avenue/BNSF Overcrossing <br />2. Bond Street Ped/Bike Improvements. (Kromer to Terminal) <br />3. Chestnut St. /Eclipse Mill Road. Improvements (Pacific to 36th) <br />4. Silver Lake Road -121st Street SE Ped. Improvements <br />5. 37th Street Improvements (Rucker to Broadway) <br />6. Collector Arterial Streetscape Improvements <br />Local Access and Other Projects <br />1. BNSF RR safety improvements (Safety) <br />2. Local roadway safety projects (Safety) <br />3. Safe routes to schools (Safety) <br />Local Access and Other Projects (continued) <br />1. Bridge Rehabilitation Program (Maintenance) <br />2. Annual Street Overlay Program (Maintenance) <br />3. Sidewalk repair and replacement (Maintenance) <br />4. Pavement marking projects (Maintenance) <br />1. 106th Place SE Improvements <br />(Street) <br />2. 3rd Avenue SE Improvements <br />(Street) <br />3. Local Street Improvements <br />(Street) <br />4. Upper & Lower Ridge Rd. Improvements <br />(Street) <br />5. Riverfront Site Access Improvements <br />(Street) <br />6. Downtown Streetscape Improvements <br />(Street) <br />1. Traffic Signal Central Control Repl. (Traffic Signals) <br />2. Traffic Signal Interconnect (Traffic Signals) <br />3. Traffic Signal Improvements (Traffic Signals) <br />4. Traffic Sign Improvements (Traffic Signals) <br />1. Neighborhood Block Grants (Neighborhoods) <br />2. Neighborhood Traffic Studies/Project (Neighborhoods) <br />3. Residential Sidewalks (Neighborhoods) <br />Non -Motorized Trail/Path Improvements <br />1. 36th St. (or vicinity) /BNSF Rail Line Ped/Bike Crossing <br />2. Smith Island Bike and Pedestrian Improvements <br />3. Bicycle Master Plan Implementation <br />4. Riverside Bus Pk. Ped. Trail (16th to N. Broadway) <br />5. West/East Marine View Drive Bike -Ped Improvements <br />6. 47th Street Ped Improvements (Evergreen to Black Forest Lane) <br />7. Pigeon Creek No. 1/BNSF Rail Line Crossing <br />8. Grand Avenue/North Marina Ped -Bike Connection <br />9. Shoreline Access Imp. (Various Locations) <br />10. Snohomish River Bike/Pedestrian Bridge Evaluation <br />11. Henry M. Jackson Ped. Bridge <br />12. Pigeon Creek Rd. No. 1 Improvements <br />13. Everett Non -motorized Projects (Various Locations in Everett) <br />14. Lowell Snohomish River Road. Bike/Ped Connection <br />15. Riverfront District Bike/Ped Paths <br />16. Interurban Trail Bike/Ped Path Improvements <br />17. Bicycle Detection Signals <br />18. ADA Signals <br />19. ADA Ramps <br />20. Central Docks Public Pathway Improvements <br />Transit <br />1. Bus Replacements - 2016 to 2021 <br />2. Implementation of State CTR Law <br />3. Everett Station Repair and Updates <br />4. Operation Base Relocation and Construction <br />5. Broadway Corridor Improvements <br />6. Safety and Security Enhancements <br />7. Corridor Pedestrian Access and Transit Improvements <br />Port - Marine Industrial Transportation Imurovements <br />1. Marine Terminals Maintenance, Improvements and <br />Facility Expansion <br />2. Marine Terminals On -dock Rail Upgrades <br />3. Everett Harbor and Snohomish River Federal Navigation <br />Channel Improvements <br />Projects in bold type not included in 2015-2020 TIP <br />