Laserfiche WebLink
CITY OF EVERETT 2016 TO 2021 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br />Project PROJECT PRIG- PE RIW CONST. Est 2015-20 LEAD MAP <br />Number TYPE <br />RITY <br />PROJECT NAME <br />START <br />START <br />START <br />Expenditures AGENCY <br />NO. <br />42 Local Access -SAF <br />1 <br />BNSF RR safety improvements <br />Jan.15 <br />Jun.16 <br />$600,000 EVERETT <br />43 Local Access -SAF <br />2 <br />Local Roadway Safety Projects <br />Jan.15 <br />Jun.16 <br />$120,000 EVERETT <br />Local Access -SAF <br />3 <br />Safe Routes to Schools <br />Jan.15 <br />Apr.16 <br />$600,000 EVERETT <br />45 Local Access-PR/M <br />1 <br />Bridge Rehabilitation Program <br />Jan.15 <br />JUI.16 <br />$3,000,000 EVERETT <br />Local Access-PR/M <br />2 <br />Annual Street Overlay Program <br />Jan.15 <br />Jul.16 <br />$6,000,000 EVERETT <br />47- Local Access -PRIM <br />3 <br />Sidewalk repair and replacement <br />Jan.15 <br />May 16 <br />$360,000 EVERETT <br />Local Access -PRIM <br />4 <br />Pavement Marking Project <br />Jan.15 <br />May 16 <br />$210,000 EVERETT <br />Local Access-STR <br />1 <br />106th Place SE Improvements <br />Nov.10 <br />JunA6 <br />$650,000 EVERETT <br />35 <br />50 Local Access-STR <br />2 <br />l3rd Avenue SE Street Improvements <br />Jan.15 <br />Apr.16 <br />$675,000 EVERETT <br />36 <br />51 Local Access-STR <br />3 <br />Local Street Improvements <br />Jul.15 <br />May 16 <br />$580,000 EVERETT <br />Local Access-STR <br />4 <br />Upper & Lower Ridge Rd. Str. Improv. <br />Aug.15 <br />Jun.16 <br />$300,000 EVERETT <br />37 <br />53 Local Access-STR <br />5 <br />Simpson Site Access Improvements <br />Aug.15 <br />Jun.16 <br />$2,000,000 EVERETT <br />38 <br />Local Access-STR <br />6 <br />Downtown Streetscape Improvements <br />Jul.14 <br />Jan. 15 <br />Apr. 16 <br />$8,000,000 ' EVERETT <br />39 <br />Local Access -SIG <br />1 <br />Traffic Signal Central Controller Replacement <br />Jan.15 <br />Jul.15 <br />$600,000 EVERETT <br />Local Access -SIG <br />2 <br />Traffic Signal Interconnect <br />Jan.15 <br />May.15 <br />$240,000 EVERETT <br />Local Access -SIG <br />3 <br />Traffic Signal Improvements <br />Jan.15 <br />Jun.15 <br />$900,000 ' EVERETT <br />Local Access -SIG <br />4 <br />Traffic Sign Improvements <br />Jan.15 <br />Jun.15 <br />$500,000 EVERETT <br />Local Access -NEI <br />1 <br />1 Neighborhood Block Grants <br />Jan.15 <br />May.15 <br />$360,000 EVERETT <br />60 Local Access -NEI <br />2 <br />Neighb. Traffic Mitigation Studies & Projects <br />Jan.15 <br />May.15 <br />$2,400,000 EVERETT <br />Local Access -NEI <br />3 <br />Residential Sidewalks <br />Jan.15 <br />May.15 <br />$2,400,000 EVERETT <br />Local Access -NM <br />1 <br />36th Street/BNSF Rail Line Ped/Bike Crossing <br />Jan.08 <br />Nov.16 <br />Jun.17 <br />$2,800,000 EVERETT <br />40 <br />93- Local Access -NM <br />2 <br />Smith Island Bike/Ped improvements <br />Jan. 10 <br />Jan.16 <br />May 18 <br />$1,000,000 EVERETT <br />41 <br />Local Access -NM <br />3 <br />Bicyle Master Plan Implementation <br />Jan.15 <br />Jan.16 <br />$200,000 EVERETT <br />Local Access -NM <br />4 <br />Riverside Business Park Ped trail <br />Apr.09 <br />Apr.16 <br />$700,000 EVERETT <br />42 <br />99- Local Access -NM <br />5 <br />WestlEast Marine View Drive Bike -Ped Improvements <br />Aug.09 I <br />Apr.16 <br />$500,000 EVERETT <br />43 <br />69 Local Access -NM <br />6 <br />47th Street Pedestrian Improvements <br />Jan.15 <br />Jun.16 <br />$500,000 EVERETT <br />44 <br />70- Local Access -NM <br />7 <br />Pigeon Creek No. i/BNSF Crossing <br />Jan. 10 <br />Jul. 16 <br />Jan.17 <br />$925,000 EVERETT <br />45 <br />Local Access -NM <br />8 <br />Henry Jackson Park Ped Bridge <br />Jan.07 <br />May.16 <br />Jul.18 <br />$2,700,000 EVERETT <br />46 <br />Local Access -NM <br />9 <br />Grand Ave./N. Marina Ped -Bike Connection <br />Jan. 15 <br />Jan.16 <br />May.17 <br />$1,050,000 EVERETT <br />12 Local Access -NM <br />10 <br />Shoreline Access Improvements <br />Apr.15 <br />Jan.16 <br />$2,400,000 EVERETT <br />Local Access -NM <br />11 <br />Snohomish River Bike and Ped. Bridge <br />Nov.01 <br />Jan.16 <br />$9,000,000 EVERETT <br />47 <br />Local Access -NM <br />12 <br />Pigeon Creek Road No. 1 Improvements <br />Apr.15 <br />Jan.16 <br />$1,000,000 EVERETT <br />48 <br />Local Access -NM <br />13 <br />Lowell Snohomish River Rd. Bike/Ped Connection <br />May.15 <br />Aug.16 <br />Jan.17 <br />$1,500,000 EVERETT <br />49 <br />Local Access -NM <br />14 <br />Everett Non -Motorized Projects <br />May.15 <br />Aug. 16 <br />Jan.17 <br />$760,000 EVERETT <br />77 Local Access -NM <br />15 <br />Riverfront District Bike/Ped Paths <br />Jul. 09 <br />Jan.16 <br />$500,000 EVERETT <br />Local Access-NM16 <br />Interurban Trail Bike/Ped Path Improvements <br />Jul. 10 <br />Jan.16 <br />$500,000 ' EVERETT <br />Local Access -NM <br />17 <br />Bicyle Detection Signals <br />Jan.15 <br />Jan.16 <br />$200,000 ' EVERETT <br />E19 <br />du Local Access -NM <br />18 <br />ADA Signals <br />Jan.15 <br />Jan.i6 <br />$200,000" EVERETT <br />61 Local Access -NM <br />1 19 <br />JADA Ramps <br />Jan.15 <br />Jan.16 <br />$200,000 • EVERETT <br />$57,130,000 <br />NOTE: Projects shown in bold type (H any) were not included in the 2015-2020Six-year TIP. <br />A portion or all of the funding for this project has not yet been committed. <br />Codes: SAF = Safety; PR/M = Preservation and Maintenance; STIR = Street construction; SIG = Traffic Signal Improvement; <br />NEI = Neighborhood Projects; LS= Landscaping Project; NM = Non -Motorized Improvement <br />