|
CITY OF EVERETT 2016 TO 2021 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br />Project PROJECT PRIG- PE RIW CONST. Est 2015-20 LEAD MAP
<br />Number TYPE
<br />RITY
<br />PROJECT NAME
<br />START
<br />START
<br />START
<br />Expenditures AGENCY
<br />NO.
<br />42 Local Access -SAF
<br />1
<br />BNSF RR safety improvements
<br />Jan.15
<br />Jun.16
<br />$600,000 EVERETT
<br />43 Local Access -SAF
<br />2
<br />Local Roadway Safety Projects
<br />Jan.15
<br />Jun.16
<br />$120,000 EVERETT
<br />Local Access -SAF
<br />3
<br />Safe Routes to Schools
<br />Jan.15
<br />Apr.16
<br />$600,000 EVERETT
<br />45 Local Access-PR/M
<br />1
<br />Bridge Rehabilitation Program
<br />Jan.15
<br />JUI.16
<br />$3,000,000 EVERETT
<br />Local Access-PR/M
<br />2
<br />Annual Street Overlay Program
<br />Jan.15
<br />Jul.16
<br />$6,000,000 EVERETT
<br />47- Local Access -PRIM
<br />3
<br />Sidewalk repair and replacement
<br />Jan.15
<br />May 16
<br />$360,000 EVERETT
<br />Local Access -PRIM
<br />4
<br />Pavement Marking Project
<br />Jan.15
<br />May 16
<br />$210,000 EVERETT
<br />Local Access-STR
<br />1
<br />106th Place SE Improvements
<br />Nov.10
<br />JunA6
<br />$650,000 EVERETT
<br />35
<br />50 Local Access-STR
<br />2
<br />l3rd Avenue SE Street Improvements
<br />Jan.15
<br />Apr.16
<br />$675,000 EVERETT
<br />36
<br />51 Local Access-STR
<br />3
<br />Local Street Improvements
<br />Jul.15
<br />May 16
<br />$580,000 EVERETT
<br />Local Access-STR
<br />4
<br />Upper & Lower Ridge Rd. Str. Improv.
<br />Aug.15
<br />Jun.16
<br />$300,000 EVERETT
<br />37
<br />53 Local Access-STR
<br />5
<br />Simpson Site Access Improvements
<br />Aug.15
<br />Jun.16
<br />$2,000,000 EVERETT
<br />38
<br />Local Access-STR
<br />6
<br />Downtown Streetscape Improvements
<br />Jul.14
<br />Jan. 15
<br />Apr. 16
<br />$8,000,000 ' EVERETT
<br />39
<br />Local Access -SIG
<br />1
<br />Traffic Signal Central Controller Replacement
<br />Jan.15
<br />Jul.15
<br />$600,000 EVERETT
<br />Local Access -SIG
<br />2
<br />Traffic Signal Interconnect
<br />Jan.15
<br />May.15
<br />$240,000 EVERETT
<br />Local Access -SIG
<br />3
<br />Traffic Signal Improvements
<br />Jan.15
<br />Jun.15
<br />$900,000 ' EVERETT
<br />Local Access -SIG
<br />4
<br />Traffic Sign Improvements
<br />Jan.15
<br />Jun.15
<br />$500,000 EVERETT
<br />Local Access -NEI
<br />1
<br />1 Neighborhood Block Grants
<br />Jan.15
<br />May.15
<br />$360,000 EVERETT
<br />60 Local Access -NEI
<br />2
<br />Neighb. Traffic Mitigation Studies & Projects
<br />Jan.15
<br />May.15
<br />$2,400,000 EVERETT
<br />Local Access -NEI
<br />3
<br />Residential Sidewalks
<br />Jan.15
<br />May.15
<br />$2,400,000 EVERETT
<br />Local Access -NM
<br />1
<br />36th Street/BNSF Rail Line Ped/Bike Crossing
<br />Jan.08
<br />Nov.16
<br />Jun.17
<br />$2,800,000 EVERETT
<br />40
<br />93- Local Access -NM
<br />2
<br />Smith Island Bike/Ped improvements
<br />Jan. 10
<br />Jan.16
<br />May 18
<br />$1,000,000 EVERETT
<br />41
<br />Local Access -NM
<br />3
<br />Bicyle Master Plan Implementation
<br />Jan.15
<br />Jan.16
<br />$200,000 EVERETT
<br />Local Access -NM
<br />4
<br />Riverside Business Park Ped trail
<br />Apr.09
<br />Apr.16
<br />$700,000 EVERETT
<br />42
<br />99- Local Access -NM
<br />5
<br />WestlEast Marine View Drive Bike -Ped Improvements
<br />Aug.09 I
<br />Apr.16
<br />$500,000 EVERETT
<br />43
<br />69 Local Access -NM
<br />6
<br />47th Street Pedestrian Improvements
<br />Jan.15
<br />Jun.16
<br />$500,000 EVERETT
<br />44
<br />70- Local Access -NM
<br />7
<br />Pigeon Creek No. i/BNSF Crossing
<br />Jan. 10
<br />Jul. 16
<br />Jan.17
<br />$925,000 EVERETT
<br />45
<br />Local Access -NM
<br />8
<br />Henry Jackson Park Ped Bridge
<br />Jan.07
<br />May.16
<br />Jul.18
<br />$2,700,000 EVERETT
<br />46
<br />Local Access -NM
<br />9
<br />Grand Ave./N. Marina Ped -Bike Connection
<br />Jan. 15
<br />Jan.16
<br />May.17
<br />$1,050,000 EVERETT
<br />12 Local Access -NM
<br />10
<br />Shoreline Access Improvements
<br />Apr.15
<br />Jan.16
<br />$2,400,000 EVERETT
<br />Local Access -NM
<br />11
<br />Snohomish River Bike and Ped. Bridge
<br />Nov.01
<br />Jan.16
<br />$9,000,000 EVERETT
<br />47
<br />Local Access -NM
<br />12
<br />Pigeon Creek Road No. 1 Improvements
<br />Apr.15
<br />Jan.16
<br />$1,000,000 EVERETT
<br />48
<br />Local Access -NM
<br />13
<br />Lowell Snohomish River Rd. Bike/Ped Connection
<br />May.15
<br />Aug.16
<br />Jan.17
<br />$1,500,000 EVERETT
<br />49
<br />Local Access -NM
<br />14
<br />Everett Non -Motorized Projects
<br />May.15
<br />Aug. 16
<br />Jan.17
<br />$760,000 EVERETT
<br />77 Local Access -NM
<br />15
<br />Riverfront District Bike/Ped Paths
<br />Jul. 09
<br />Jan.16
<br />$500,000 EVERETT
<br />Local Access-NM16
<br />Interurban Trail Bike/Ped Path Improvements
<br />Jul. 10
<br />Jan.16
<br />$500,000 ' EVERETT
<br />Local Access -NM
<br />17
<br />Bicyle Detection Signals
<br />Jan.15
<br />Jan.16
<br />$200,000 ' EVERETT
<br />E19
<br />du Local Access -NM
<br />18
<br />ADA Signals
<br />Jan.15
<br />Jan.i6
<br />$200,000" EVERETT
<br />61 Local Access -NM
<br />1 19
<br />JADA Ramps
<br />Jan.15
<br />Jan.16
<br />$200,000 • EVERETT
<br />$57,130,000
<br />NOTE: Projects shown in bold type (H any) were not included in the 2015-2020Six-year TIP.
<br />A portion or all of the funding for this project has not yet been committed.
<br />Codes: SAF = Safety; PR/M = Preservation and Maintenance; STIR = Street construction; SIG = Traffic Signal Improvement;
<br />NEI = Neighborhood Projects; LS= Landscaping Project; NM = Non -Motorized Improvement
<br />
|