Laserfiche WebLink
City of Everett <br /> In � �� " Improveme��t Plan Checklist <br /> d 0�1 Vl IC I�l(�,U1e �( 8� 13��S <br /> Checklist Prepared By Date <br /> Street and/or Storm Drain Improvements (I) <br /> Plat or Project �CAS Cc�C�l0.�n � h{S S i� <br /> i <br /> '� Nortls Arrow <br /> (/ Scale Indicated (vertical and horizontal) I <br /> 1"=40' horizontal and 1"=5' vertical, minimum <br /> ✓ Names on all streets, centerline shown ( Rp�� {-o y�W- ��,�,�e�c�-�,�c�Zs�c�� � <br />; ✓ Indicate Right-of-Way and Improvement Widths <br /> !� Indicate existing improvements with dashed lines � <br /> ✓ Show new improvements to be constructed with solid lines <br /> � Indicate all existing pipe lines, utilities, power poles, etc. <br /> address all conflict points and indicate their disposition and by whom <br /> rlA Show centerline stationing (stationing is to run left to right) <br /> NQ Indicate stationing for all beginning of curb returns (BCR's) <br /> and ends of curb returns (ECR's) and BC's and EC's of all <br /> centerline curves. <br /> N A Indicate curve data on plans for centerline curves and curb returns <br /> (Delta, Tangent, Radius, Length) . <br /> �� Indicate stationing at beginning and end oF improvement work. <br /> N A Indicate Top Curb (TC) elevations at all BCR's and ECR's and at <br /> ends of existing curb and gutter that is being joined or matched <br /> with new improvements. <br /> �lf� Pavement flares to transition from existing E.P. to new improvements <br /> are to be shown at 2:1 incoming and 5:1 outgoing. <br /> `�IA� Asphalt concrete transition ramps are to be shown at ends of new <br /> sidewafk sections where sidewalk does not exist. <br /> hlA IndicaRe drainage patterns at both ends of new improvements and � <br /> work needed to insure existing drainage is not blocked. <br />