My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2316 12TH ST 2016-01-01 MF Import
>
Address Records
>
12TH ST
>
2316
>
2316 12TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 9:22:29 AM
Creation date
4/4/2017 9:21:26 AM
Metadata
Fields
Template:
Address Document
Street Name
12TH ST
Street Number
2316
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�2F.T_3 .,_ E: IC:-.:ICriS ..2JD Li�? GF i7CD :0 �ii B=J <br /> ?age <br /> address : <br /> 4 . Plumbing <br /> B�s bathroom Remove the wall hung sink and <br /> reinstall, along with another closely matching wall hung <br /> sink on the new wood framed wall at location as <br /> indicated on the drawings . Plumb in both sinks and <br /> complete with new push handle hot and cold water <br /> faucets, Chicago " time-release" val��es or equal . Cap <br /> off water and waste lines from sinks at. old locations <br /> removing shut-offs and keeping piping back in wall . <br /> Fi�l in remaining sink holes left in wa11 using a <br /> closely matching tile, groutiny in complete . <br /> More boys bathroom plumbinq. Plumb in complete a new <br /> commercial wa11 ?�ung white porcelain to:let with <br /> flush-o-meter valve, Sloan valve or equal . Water closet <br /> shall be mounted with the top of the seat 16" - 18" From <br /> the finished floor . Toilet waste lin� to be in cast <br /> iron. <br /> Girls bathroom. Remove urinal trough and tank <br /> complete along with related water and waste lines , <br /> capping off lines and sealing ?n remaining holes in <br /> block with appropriate materials in prepar.ation Eor <br /> painting. Replace damaged tiles with matching . Remove <br /> the east wall-hung sink and reinstall at the new <br /> location where water and waste lines exist . Plumb in <br /> complete, and add new push handle hot and cold water <br /> faucet valves , Chicago "time release" valves or equal , <br /> to both existing sinks (2) . Make sure both sinks are <br /> securely fastened to the wall , tightening up screws as <br /> needed. Cap off . remaining plumbing lines in wall , <br /> remove sink hanger and replace all damaged tiles closing <br /> a11 holes in wall . <br /> Water r_ooler . Remove the existing wall hung water <br /> fountain, and after the wall tile has been replaced , <br /> plumb in complete a new 8 gallon water cooler , Elkay <br /> EWA-8 water cooler , or equal . <br /> All new plumbing fixtures to be "A" grade and , <br /> competitive styling . <br /> All work in this item shall be performed in comp'_iance <br /> a•ith the requirements of the Uniform Plumbing Code, 1985 <br /> edition and the adopted Washington State Rules and <br /> kegulations for Rarrier Free Design . <br /> $ <br /> 5. Electrical <br /> Boys 6athroom. Remove al]. recessed ceiling light <br /> fixtures over the entire bathroom area except in the <br /> shower. Wire in complete four rows of ciouble tube <br /> florescent ].ight. . f; �}�,•-�� =-_--_�M ��� -- � . - . <br /> ".. ""' ���t� �'i�e Ceiiiuy <br /> joists' overhead, three rows to^ be made up with L-hree 4 ' <br /> 0" fixt�res and placed over the large area. One row to <br /> be made up with two 9 ' 0" fixtures spaced apart over the <br /> entrance ha�;lway and placed to fully light this area . <br /> New fixture� to be Lithonia C248 fixtures , or equal , and <br /> installed complete with tubes , shatter proof lenses set <br /> in T-bar metal frames . Fixtures can be either hung with <br /> chains or fastened against blocking . <br />
The URL can be used to link to this page
Your browser does not support the video tag.