My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10418 13TH AVE W 2016-01-01 MF Import
>
Address Records
>
13TH AVE W
>
10418
>
10418 13TH AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 9:53:45 AM
Creation date
4/4/2017 9:53:33 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH AVE W
Street Number
10418
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. CONTACT YOUR INSPECI OR, RANDY ALLEN AT 425339-7403, CLIFF LINDMAN AT 425-339- <br /> 7404, PRIOR TO BEGINNING THIS PROJECT <br /> 5 Connect side sewer per City Standard#601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> i <br /> / 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> ��/ <br /> 9. Rooftop runoff must be discharged to a roof downspeut infltration system per City of Everett Storm <br /> Manual 3-2.6.2. The appruximate size trench is 3.5' wide, 2' deep and 25' long. See attachiment for <br /> more details. <br /> j �'~10. 1 The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> \.`�/ beginning the project. <br /> 11. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 12. Inslall erosion control measures per City o(Everett Standards for small parcels <br /> 13. Remove erosion control r�easures upon completion of the project prior to final approval of th� permit. <br /> 14. l+II excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this building lot. <br /> 15. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 16. No building materials to be stacked on roadway and roadway to be kept clean and open for pedestrian <br /> travel. <br /> 1Z Adjust water meter box 1" above sidewalk grade. <br /> 18. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A 8 306 on <br /> this proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 19. Install a Type I concrete driveway per C�ty of Everett Standard #307. <br /> 20. Pave driveway from the front properly line out to the street paving. <br /> 21. Contact the Water District for connecting provisions for this building's water and <br /> sewer services. <br /> i <br /> 22 A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan #410 is required for the <br /> parking area. <br /> 23 If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br /> gravity flow across the public right-of-way. <br /> 24 A sprinkler system is required for this building in compliance with the requiremer,;s of NFPA Standards <br /> 13D. <br /> PC'Comments — <br /> L <br /> < <br /> L� <br />
The URL can be used to link to this page
Your browser does not support the video tag.