Laserfiche WebLink
. ' � +� <br /> PUBLIr WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #6U1. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. Corinect rooftop downspouts to the drainage system provided for this lot. <br /> �jf�ooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> �� Storm Manual 3-2.6.2. Width 3 ' , Depth��s;Length�. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12 nstall erosion control measures per Cirj of Everett Standards for small parcels <br /> 13. emove erosion controi measures upon completion of the project prior to final approval of the <br /> permit. <br /> , 14. II excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per Ciry of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> i 6. Install a Type I concrete driveway per City of Everett Siandard #307. <br /> �Pave diiveway from the front property line out to the street paving. <br /> 18 Contact the (vlU,ki(4eo Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan �402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow 2cross the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> PIYCcmments <br /> �/Z <br />