Laserfiche WebLink
CITY OF EVERETT PROJECT ACTION LIST FOR PROPOSED 1997 • <br /> TRANSPORTATION FINANCING PACKAGE <br /> .5 <br /> City: Everett <br /> Contact Name: David H.Davis,P.E.;City Engineer <br /> Contact Telephone: (20e)2596600 <br /> ---- Is Project 6-year <br /> Priority Project Project Regionally Legislative Freight Economic Project Start Estimated' Requested' <br /> NumberName/Descri'lion Type Si nificanl7 Location District Co ,•eslion-Mobild Develo men, Betel Phase s Dale Cost Fund <br /> • : I r.an -ane se ton rom TFT <br /> • <br /> 112th Street to 132nd Street X X PE,1iAN,C 1997 $20,900 38,000 <br /> 2 Everett Multimodal Transportation S,T,N Y Pacific Ave end 38 X <br /> Center Smith Street - <br /> 3 1 1-5:Median 11OV Lanes,SR 528 S,T Y SR 52610 41st Street 38 X <br /> X PE 1998 $1,750 $1,750 <br /> to 4111 StreetX PE 1998 $750 $750 <br /> • 4 1-5:Median IIOV Lanes,Auxiliary S,T Y 41st Street to SR 2 38 X <br /> Lane,41st to SR 2X ----1 PE 19e6 1800 1600 <br /> 5 1-5:11OV Direct Access Ramp al 3,7 Y 41st Street to SB I-S 38 X <br /> 41st Sheet to SB I-5X PE 1998 $800 1800 <br /> 8 1-5:11OV Direct Access Ramps at S,T Y Pacific Avenue 38 X <br /> Pacific Ave.,SB on NB onX X PE,RAN,C 1997 110,000 110000 <br /> 7 Pacific Ave./BSNR RR Overcrosstng S,T,N Y Pacific Ave al BNSR 38 X X <br /> at-grade crossing <br /> 8 1112th Street/I-5 Flyer Stop,Direct S,T Y 112th Street and 1-5 38 X <br /> X X PE,RAN,C 1997 114.000 $11,00 <br /> Access Ramps,and PIR Lot X X PE,RAN,C 1997 $5,000 $2,000 <br /> 9 112th Street:Widen horn SR 527 S,N N SR 527 to SR 99 38 X <br /> to SR 99X PE,RAN,C 1997 $15,000 $15,000 <br /> " 10 36Th Street P/R Lot and Related S,T,N N 36th Street,Broadway 38 X <br /> Access Improvements 41st Street <br /> 11 Evergreen Way:Urban 7-lane section S,N N Pecks <br /> Drive Street o 38 X X , X X PE,RAN,C 1997 $1,500 $1.000 <br /> from Pecks Drive 10 52nd Street <br /> L 12 41st Street:Urban 4-lane section from S,N N Friday Avenue to 38 X X X PE,RNV,C 1997 $1,100 $800 <br /> Friday Avenue to Rucker Avenue Rucker Avenue Total $89.500 $80.300 <br /> Intel Unhtntied <br /> Project Types: <br /> S Street 8-year System Preservation Needs $9,000,000 $3,000,000 <br /> 11 Non-motorized <br /> M Maintenance 8-year System Maintenance Needs $12,000,000 31,200,000 <br /> - <br /> T Preservation <br /> SW Stormwater ' 6-year Stormwater System Needs $10,880,000 $800,000 <br /> •Estimated oost/requested funding amounts given In thousands of dollars. <br />