My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4324
>
Resolutions
>
Resolution 4324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 10:55:13 AM
Creation date
4/4/2017 10:55:11 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4324
Date
9/25/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "B" <br /> LID No. 735 <br /> Evergreen Way Street Improvement <br /> Pecks Dr. to 52nd Street <br /> IMPROVEMENTS TO BE CONSTRUCTED <br /> Evergreen Way - <br /> A seven-lane standard street improvement, as adopted by the Everett City Council on <br /> April 12, 1978. Said standard Street improvement is to include pavement widening with <br /> curb, gutter and sidewalks, and on-street public parking facilities in locations to be <br /> determined in the plans and specifications to be prepared by the City Engineer. The on- <br /> street public parking facilities shall be adjacent to the standard improvement. <br /> 52 nd Street - <br /> Widen pavement to match existing improvement on East side of Evergreen Way; curb , <br /> gutter, and sidewalk on South side to Fleming St. <br /> 57th Street- <br /> Widen to 26 foot pavement with curb, gutter, and sidewalks on North and South sides to <br /> Fleming Street. <br /> Highway Place - <br /> Maintain 32 foot pavement , and install curb, gutter, and sidewalk on the South side <br /> and, in addition to the improvements described above; all necessary appurtenances as <br /> determined by the City Engineer to include, but not limited to, storm drainage, <br /> landscaping, and traffic signal improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.