Laserfiche WebLink
Gordon Witcher <br /> From: Dave Voigt <br /> Sent: Wednesday, May 01, 2013 3 35 PM <br /> To: Gordon Witcher <br /> Subject PR�10E- stormwater ponds <br /> Gordon, <br /> The meeting today with Patrick and Mike G. helped to darify some of the design questiom I had. <br /> Our discussions revealed some potential minor changes that would allow them to do better/easier maintenance to <br /> remove debris and grit from the system, to modify the restrictor sizing and revise the overflow strategy. <br /> The proposed extra facilities to add the CUP runoff to ihe ponds needs some additional evaluation to confirm it <br /> can/should be done: <br /> 1) That the nearby fuel tanks are not an obstacle for the needed pipe run, and <br /> 2) 7here is a workable mechanism for the City to compensate PRMCE for the engineering and construction and the <br /> cost is reasonable. <br /> I intend to approve the plans as submitted today so they can proceed with ihe project. <br /> Patrick will explore the situation for item 1) above and I will need Paul MCKee's assistance with item 2). <br /> Dave <br /> David Voigt. P.E. <br /> Senior Engineer, Project Manager <br /> City o/Everett, Public Woiks <br /> Phone 425-257-8983 <br /> Emad DVoiqt(o�everettwa qov <br /> 1 <br />