Laserfiche WebLink
� � <br /> INFORMATION TOR D�VELOPER: <br /> T': following information is provided for the develo�,er's benefit. These are not S�PA conditions but are <br /> a:..,�ciated with other la�vs or requirements. All requirements are preliminary in nature, and are based <br /> u{�on the preliminary site plan and the ordinances �n effect at time of submittal for SEPA review. The <br /> peoposal must comply with all ordinances in effect at the time a complete building permit �pplicatime <br /> is Gled, including those not speciCcally set fcrth herein. Contact the Planning Department for <br /> in.'brmation regarding appeals processes for the requirements listed in this document. <br /> l. A Public Works 1'cimit is required for this projecL Detailed drawings in accordance with City <br /> Design and Construction Standards shall be submitted to the Public Works Departntent, sUowing sitc <br /> parking layout, landscaping, utilitics, stonn drainage, temporlry construction crosion control, and all <br /> required improvements in the public rigl�t-ol=way. Public Works Department approval of tliese <br /> drawings is rcquircd prior to any pcnnits being issued. All improvements shall Ue completeci, <br /> appirovcd and warranted bcfore the Occupancy Pcrmit is issued/final approval is granted. <br /> 2. Parking must be per City Zoning Code and City Design and Construction Standards for <br /> Devdopment. Off-street parking must be provided for construction workers and Everett Community <br /> Collegc tisc during coustrucliou. Rcpair or replace any roadway, curU, gutter, or side�valk impacted <br /> during work. <br /> 3. Drive�vay curb cut may bc up to 30 feet wide (Dimension"1" on standard dra�ving 307/308/309) to <br /> accommodate large vehicic�ccess. Parallel parking stalls should be 22 Feet lor.g cacU(90 degree <br /> parking OK as shown) <br /> 4. Repair or rcplace any roadway, curb, gutter, or sidewalk impacted during work. Replacc; sidewalk ai <br /> west end of property on 13'�'. <br /> 5. Any grading/fill on this site shall be done so as to not impact the sunounding properties. <br /> G. This project must com�ly with the current City of Everett Building Code and Spri�tkler Ordinance. <br /> Constniction of this building ��•ill requirc adhcrence to the City of Gverett building code and a <br /> buildii�g pcnnit. <br /> 7. Approval of construction plans will require demonstration that all pertinent standards and regulations <br /> 8iC I11C�. <br /> 8. Tiic proposecl utility crossin&a� 13'�'street bctwccn tl�e project sitc and t(te future tower building <br /> must be establislied by mcans of an agreement with the City of Evcrett for tl�e right-of-�vay access. <br /> This agreement will require approval by the City Council. <br /> 9. The construclion method for the utilify crossing must Uc approvzd and permittccl by the City of <br /> Everett. Thc new utility shall bc added to (and maintaincd on) qic Washington "U!ilities <br /> Ufrder�rorurd Locntio�r Center" utility locatc scrvice by (aud at thc cxpense o� the applicant. <br /> ]0. A fire hydrnnt is required within 200 driving feet Uut not closer dian 50 feet of every structure. <br /> I 1. City strcets and alleys are to Ue kept clear of ditK and dcbris at all times during construction. Dust <br /> suppression and street cicaning must occur as directed by thc Public Works inspector. <br /> 12. A one ycar warranty is required on dic public improvcment for an amount not Icss than 10% of the <br /> cost of constniction and shall nm for one ycar from thc date of final approval/issuancc of the first <br /> Occupancy Pcrmit. <br /> 4 <br />