My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4298
>
Resolutions
>
Resolution 4298
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 11:24:21 AM
Creation date
4/4/2017 11:24:02 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4298
Date
7/3/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1997 TO 2002 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 7 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC LOCAL ACCESS Resolution No. <br /> Th.— PROJECT IDENTIFICATION <br /> I --• • 1 'III •Ii • I• 11.- <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N i A.FEDERAL AID ROUTE NO. p a t e i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.BRIDGE NO. r T t a n I o PROJECT MONTH/Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T I r C.PROJECT TITLE o y u I g i d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. RM/ <br /> N a i N D.STREET/COUNTY ROAD NAME OR NUMBER v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t• E.TERMINAL BEGINNING AND END .e h y s STARTS Phase UATA 6th Y/N <br /> s F.DESCRIBE WORK TO BE DONE OTHER, DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 : A.0529 12 00 00 PE 1/97* EIS: <br /> B.N/A F R/W CE: <br /> C.EVERETT AVENUE SIGNAL IMPROVEMENTS CONST 6/97* EA: DATE: <br /> D.ROCKEFELLER,OAKES TOTAL 400 400 400 N/A: <br /> E.EVERETT AVENUE,SR 529 <br /> F.IMPROVE EVERETT AVE.SIGNALS <br /> 19 9 A.VARIOUS ROUTES 12 00 •C PE EIS: NO <br /> B.N/A F P R/W CE:X <br /> C.SIGNAL MASTER&INTERCONNECT T CONST 5/97* 315 STP(U) 500 815 125 75 75 225 EA: DATE: <br /> D.VARIOUS LOCATIONS WITHIN THE CITY LIMITS TOTAL 315 N/A: <br /> E.IBID. <br /> F.DESIGN&CONSTRUCT INTERCONNECT;UPGRADE SIG.MASTER <br /> 19 10 A.VARIOUS ROUTES 12 00 00 PE 1/97* EIS: <br /> B.N/A F R/W CE: <br /> C.INTERIM TRAFFIC SIGNALS CONST 6/97* EA: DATE: <br /> D.VARIOUS LOCATIONS WITHIN THE CITY LIMITS TOTAL 900 900 150 150 150 450 N/A: <br /> E.IBID. <br /> F.CONSTRUCT INTERIM SIGNALS <br /> 19 11 A.2783,2781,2791 12 00 C PE 3/98* EIS: <br /> B.N/A 14 F P R/W CE: <br /> C.DEVELOPER SIGNALS T CONST 10/98* EA: DATE: <br /> D.MERRILL CRK./SEAWAY&HARDESON;ETC. TOTAL 600 600 600 N/A: <br /> E.IBID. <br /> F.CONSTRUCT SIGNALS <br /> 19 12 A.2715,2795,2797,0099,2777,ETC. 12 F 00 C PE 2/97* EIS: <br /> — <br /> B.N/A 06 & P R/W CE: <br /> C.HES PROJECTS 32 S T CONST 8/97* EA: DATE: <br /> D.15TH&E.M.VIEW DR.;EVERETT MALL WAY ACCESS RESTRICTIONS; TOTAL _ 55 555 250 255 50 N/A: <br /> EXPOSED BRIDGE ENDS;BROADWAY&18TH PED SIGNAL,ETC. <br /> E.IBID. <br /> F.HAZARD ELIMINATION AND SAFETY PROJECTS <br /> *A po on or all of the funding for these projects has not yefbeen committed. <br /> NOTE"Local Funds"include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.