Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997-2002 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 9 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC TRANSIT PROJECTS Resolution No. <br /> F P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m T o L t FEDERAL FUNDING FEDERALLY <br /> N i A. PROJECT TITLE p A t o i C EXPENDITURE SCHEDULE FUNDED <br /> C C o B.STREET/COUNTY ROAD NAME OR NUMBER r T T a n I o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T I r C.TERMINAL BEGINNING AND END o y U I g i d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIRON RAN <br /> N a i N D.DESCRIBE WORK TO BE DONE v p S t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ? <br /> L s t o .e h y s STARTS Phase UATA 6th, <br /> s y. - OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> O 1 A.Buses(Replacement) PE EIS: <br /> B.6-13 in 1997 21 F 0 RNV '''' Dec-97 S9 1,480 370 1,850 1,850 CE:x <br /> C. CONST EA: DATE <br /> D. TOTAL NA: <br /> E. <br /> F. <br /> O 1 A.Buses(Replacement) PE EIS: <br /> B. 15 in 1999 21 p 0 R/W; Jul-99 S9 3,600 900 4,500 4,500 CE:X <br /> C. CONST EA: DATE <br /> D. TOTAL NA: <br /> E. <br /> F. <br /> 0 1 A. Paratransit Vehicles(Replacement) PE _ EIS: <br /> B.5 in 1997 and 4 in 1998 21 P 0 RAN Jul-99 Other 520 130 650 650 CE:x <br /> C. CONST EA: DATE <br /> D. TOTAL NA: <br /> E. <br /> F. <br /> O 1 A.Operating Assistance PE EIS: <br /> B. 22 P 0 RNV 600 1,200 200 200 200 600 CE:X <br /> C. CONST Jul-97 S9 1,200 EA: DATE <br /> D. TOTAL NA: <br /> E. <br /> F. <br /> O 2 A.Regional Fare Coordination Project 21 P 0 PE EIS: <br /> B.Smart Card Technology System Design RAN CMAQ 152 24 176 16 15 35 100 CE:x <br /> C.Hardware and Software equipment CONST S9 100 25 125 10 10 25 80 EA: DATE <br /> D.King County Metro is lead agency TOTAL NA: <br /> E. <br /> F. <br />