My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4298
>
Resolutions
>
Resolution 4298
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 11:24:21 AM
Creation date
4/4/2017 11:24:02 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4298
Date
7/3/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#01.11°' <br /> CITY OF EVERETT <br /> 1997 TO 2002 SIX-YEAR TRANSPORTATION IMPROVEMENT PLAN <br /> Interstates and Freeways <br /> 1. SR 526/Evergreen Way Overcrossing 2. Neighborhood Mitigation Signal Projects <br /> 2. I-5 Median HOV Lanes(164th to SR 526) 3. Neighborhood Traffic Mitigation Projects <br /> 3. I-5 Median HOV Lanes(SR 526 to 41st Street) 4. Boeing Mitigation Park&Ride Lots <br /> 4. I-5 Median HOV Lanes(41st Street to SR 2) 5. Pedestrian Improvements <br /> 5. I-5/41st Street Direct HOV Access Ramps 6. Neighborhood Block Grant <br /> 6. I-5/Pacific Avenue Direct HOV Access Ramps 7. Pavement Markings <br /> 7. I-5/112th Street Direct HOV Access Ramps 8. Everett Avenue Signals <br /> 8. SR 526 HOV Lane(I-5 to 34th Avenue) 9. Signal Master&Interconnect <br /> 9. HOV Treatment of SR 96/1-5 Interchange 10. Interim Traffic Signals <br /> 10. Interchange Studies and Improvements 11. Developer Signals <br /> 12. HES Projects <br /> Principal Arterials 13. Roadway Hazard Elimination <br /> 14. Neighborhood Traffic Studies <br /> 1. 19th Avenue SE 15. Northern Extension of Interurban Trail <br /> 2. Pacific Avenue/BNSF Railroad Overcrossing 16. Everett Nonmotorized Trail System <br /> 3. Evergreen Way(108th to 112th) 17. City Entryway Landscaping and Signs <br /> 4. Evergreen Way(Madison to Pecks) <br /> 5. Evergreen Way(Pecks to 52nd) Transit <br /> 6. 41st Street <br /> 7. E.Marine View Dr.(Alverson to N. Broadway) 1. Bus Replacements(1997) <br /> 8. East Marine View Drive(N.Broadway to I-5) 2. Bus Replacements(1999) <br /> 9. Mukilteo Blvd./41st Street Corridor 3. Paratransit Vehicle Replacements(1997-2000) <br /> and Pedestrian Study 4. Transit Operating Assistance <br /> 10. Arterial Needs Study 5. Regional Fare Coordination Project <br /> 11. Airport Road HOV Lanes 6. Buses For Expansion; 1997-2000 <br /> 12. Paine Field Blvd./SR 525 Corridor 7. Bus Stop Improvements <br /> 13. Everett Avenue(Norton to Waterfront) 8. Security Equipment <br /> 14. SR 525 HOV Lanes 9. Electronic Farebox Equipment <br /> 15. SR 96 HOV Lanes 10. Fixed-route Automated Computer Scheduling <br /> 16. Paine Field Blvd.Extension Studies 11. Operations Support Vehicles <br /> 12. Transit O&M Facility <br /> Minor Arterials <br /> HOV Projects <br /> 1. 112th Street <br /> 2. 100th Street SE 1. Multimodal Transportation Facility(II) <br /> 3. 4th Avenue West 2. Multimodal Transportation Facility(II) <br /> 4. Seaway Boulevard 3. Multimodal Transportation Facility(III) <br /> 5. 100th Street SW 4. SR 99 North Transit Priority Project <br /> 5. SR 99 Transit/HOV Treatment <br /> Collector Arterials 6. Evergreen Way Transit/HOV Treatment <br /> 7. Park and Ride Facilities <br /> 1. 36th Street P/R Lot and Access Improvements 8. South Everett Transit Center(I) <br /> 2. 75th Street(Beverly Lane to Beverly Blvd.) 9. South Everett Transit Center(II) <br /> 3. Collector Arterial Needs Study 10. South Everett Transit Center(III) <br /> 4. Riverside Industrial Park Bridge 11. North Everett Transit Center(I) <br /> 12. North Everett Transit Center(II) <br /> Local Access <br /> 1. Annual Street Overlays <br />
The URL can be used to link to this page
Your browser does not support the video tag.