Laserfiche WebLink
CITY OF EVERETT <br /> 1997-2002 SIX-YEAR TRANSPORTATION IMPROVEMENT PLAN SUMMARY <br /> PROJECT PROJECT PE RAN CONST. '97-2002 Lead Map <br /> TYPE PRIORITY NAME TERMINI START START START COST Agency No. <br /> Interstates and Freeways 1 SR 526/Evergreen Way Overcrossing SR 526 and Evergreen Way , 4/96 4/97 $1,900,000 EVT 1 <br /> Interstates and Freeways 2 1-5 Median HOV Lanes,164th I/C 164th to SR 526 3/93 8/98 2/99 $32,656,000 • WSDOT 2 <br /> Interstates and Freeways 3 1-5 Median HOV Lanes SR 526 to 41st Street 8/98 8/2000 2/2001 $25,000,000 ` WSDOT 3 <br /> Interstates and Freeways 4 1-5 Median HOV Lanes 41st Street to SR 2 8/98 8/2000 2/2001 $25,000,000 • WSDOT 4 <br /> Interstates and Freeways 5 I-5/41st Street Direct HOV Lane Access Ramps 41st Street and 1-5 8/98 8/2000 2/2001 $8,000,000 • WSDOT 5 <br /> Interstates and Freeways 6 1-5/Pacific Ave.Direct HOV Lane Access Ramps Pacific Avenue and 1-5 8/98 8/2000 212001 $8,000,000 * WSDOT 6 <br /> Interstates and Freeways 7 I-5/112th Street Direct HOV Lane Access Ramps 112th Street and 1-5 8/98 8/2000 2/2001 $12,000,000 • WSDOT 7 <br /> Interstates and Freeways 8 SR 526 HOV Lane 1-5 to 34th Avenue 5/2001 2/2002 $25,000,000 • WSDOT 8 <br /> Interstates and Freeways 9 HOV Treatment of SR 96/1-5 Interchange 128th Street S.E./I-5 Interchange 3/94 6/98 $1,800,000 WSDOT 9 <br /> Interstates and Freeways 10 Interchange Studies and Improvements I-5/12th;1-5/Pacific;l-5/SR 2,1-5/41st,etc. 3/98 $500,000 • EVT 10 <br /> Principal Arterials 1 19th Avenue SE(SR 527) 112th Street to 132nd Street 1/93 9/96 3/97 $7,300,000 • EVT 11 <br /> Principal Arterials 2 Pacific Avenue/BNSF Railroad Overcrossing Pacific Ave.at BNSF Rail Line 2/99 3/2000 5/2001 $10,000,000 • EVT 12 <br /> Principal Arterials 3 Evergreen Way 108th Street to 112th Street 6/96 3/97 $400,000 EVT 13 <br /> Principal Arterials 4 Evergreen Way Madison Street to Pecks Drive 8/96 3/97 $900,000 EVT 14 <br /> Principal Arterials 5 Evergreen Way Pecks Drive to 52nd Street 10/98 7/99 $1,100,000 • EVT 15 <br /> Principal Arterials 6 41st Street Rucker Ave.to Friday Ave. 5/98 8/98 2/99 $982,000 • EVT 16 <br /> Principal Arterials 7 East Marine View Drive Alverson Bridge to N.Broadway 11/95 4/96 7/96 $1,000,000 • EVT 17 <br /> Principal Arterials 8 East Marine View Drive N.Broadway to 1-5 3/99 5/2000 $3,000,000 • EVT 18 <br /> Principal Arterials 9 Muk.Blvd./41st St.Corr./Ped.Study Broadway to Dogwood/Olympic 2/99 $100,000 • EVT 19 <br /> Principal Arterials 10 Arterial Needs Study Seaway,Broadway,112th,etc. 5/98 $250,000 • EVT No map <br /> Principal Arterials 11 Airport Road HOV Lanes Casino Road to SR 99 10/94 1/95 3/98 $4,450,000 SNO CTY 20 <br /> Principal Arterials 12 SR 525/Paine Field Blvd.Projects SR 526 to SR 99 12/91 9/95 9/96 $69,000,000 • WSDOT 21 <br /> Principal Arterials 13 Everett Avenue Improvements Norton Avenue to Waterfront 3/98 5/99 $1,900,000 • EVT/PORT 22 <br /> Principal Arterials 14 SR 525 HOV Lanes SR 99 to 1-5 3/93 10/97 $10,100,000 • WSDOT 23 <br /> Principal Arterials 15 SR 96 HOV Lanes 1-5 to Dumas Road 3/95 4/96 6/97 $2,700,000 SNO CTY 24 <br /> Principal Arterials 16 Paine Field Blvd.Ext.Study SR 526 to Mukilteo waterfront 6/99 $1,000,000 • MUK 25 <br /> Minor Arterials 1 112th Street SR 527 to SR 525 2/93 1/97 3/98 $15,700,000 • SNO CTY 26 <br /> Minor Arterials 2 100th Street SE 19th Avenue to 35th Avenue 4/94 6/96 6/98 $1,797,000 SNO CTY 27 <br /> Minor Arterials 3 4th Avenue West Hardeson Road to Holly Drive 7/96 5/97 3/98 $2,350,000 EVT 28 <br /> Minor Arterials 4 Seaway Blvd. 75th Street to 36th Street 2/98 9/98 5/99 $2,000,000 • EVT 29 <br /> Minor Arterials 5 100th Street SW Airport Rd to Evergreen Way 2/2000 $200,000 • SNO CTY 30 <br /> Collector Arterials 1 36th Street P/R Lot and Access Improvements 36th Street,Broadway,41st Street 8/99 5/2000 3/2001 $15,000,000 • EVT 31 <br /> Collector Arterials 2 75th Street Improvements Beverly Lane to Beverly Blvd. 5/96 10/96 5/97 $1,000,000 EVT 32 <br /> Collector Arterials 3 Collector Arterial Needs Study Various Locations 4/98 $50,000 • EVT No map <br /> Collector Arterials 4 Riverside Industrial Park Access Bridge. Vicinity of 1-5 and E.Marine View Dr. 11/97 3/98 7/99 $5,400,000 • EVT 33 <br /> Local Access 1 Annual Street Overlays Various streets within city 1/97 7/97 $2,962,000 • EVT No map <br /> Local Access 2 Neighborhood Mitigation Signals Various locations within city 3/93 9/94 3/95 $250,000 EVT 34 <br /> Local Access 3 Neighborhood Mitigation Projects Various locations within city 5/93 $600,000 EVT 35 <br /> Local Access 4 Boeing Mitigation P/R Lots Various locations within city 2/94 5/94 $1,000,000 EVT No map <br /> Local Access 5 Pedestrian Improvements Various locations within city 1/97 5/97 $300,000 • EVT No map <br /> Local Access 6 Neighborhood Block Grants Various locations within city 1/97 5/97 $360,000 • EVT No map <br /> Local Access 7 Pavement Marking Projects Various locations within city 1/97 5/97 $480,000 • EVT No map <br /> Local Access 8 Everett Avenue Signals Various Everett Avenue Signals 1/97 6/97 $400,000 • EVT 36 <br /> Local Access 9 Signal Master&Interconnect Various locations within city 5/97 $500,000 • EVT No map <br /> Local Access 10 Interim Traffic Signals Various locations within city 1/97 6/97 $900,000 • EVT No map <br /> Local Access 11 Developer Signals Various locations within city 3/98 10/98 $600,000 • EVT 37 <br /> Local Access 12 HES Projects Various locations within city 2/97 8/97 $550,000 * EVT 38 <br /> Local Access 13 Roadway Hazard Elimination Various locations within city 6/97 $120,000 • EVT No map <br /> Local Access 14 Neighborhood Traffic Studies Various locations within city 2/97 $70,000 • EVT No map <br /> Local Access 15 Northam Extension of Interurban Trail SR 526 to Madison Street 10/95 6/96 8/96 $556,000 EVT 39 <br /> Local Access 16 Everett Nonmotorized Trail System Various locations within city 7/95 10/95 5/96 $800,000 • EVT 40 <br /> Local Access 17 City Entryway Landscaping and Signs Entryway corridors within city 3/97 7/97 $150,000 • EVT No map <br /> Transit Projects 1 Bus Replacements;1997 N/A $1,850,000 ET No map <br /> Transit Projects 1 Bus Replacements;1999 N/A $4,500,000 • ET No map <br /> Transit Projects 1 Paratransit Vehicle Replacement;97-00 N/A $650,000 • ET No map <br /> Transit Projects 1 Transit Operating Assistance N/A $1,200,000 • ET No map <br /> Transit Projects 2 Regional Fare Coordination Project N/A $219,000 Metro No map <br /> Transit Projects 1 Buses for Service Expansion;97-2000 N/A $6,630,000 • ET No map <br /> Transit Projects 2 Bus Stop Improvements N/A $200,000 ET No map <br /> Transit Projects 2 Security Equipment N/A $100,000 • ET No map <br /> Transit Projects 3 Electronic Farebox Equipment N/A $200,000 ET No map <br /> Transit Projects 3 Fixed-route Automated Computer Schd. N/A $25,000 ET No map <br /> Transit Projects 3 Operations Support Vehicles N/A $35,000 • ET No map <br /> Transit Projects 2 Transit O&M Facility Not yet determined 8/96 7/99 $1,700,000 • ET No map <br /> HOV Projects 1 Multimodal Transportation Facility Phase II Smith&Pacific 1/96 $3,375,000 ET No map <br /> HOV Projects 1 Multimodal Transportation Facility Phase II Smith&Pacific 1/96 8/96 $4,950,000 • ET No map <br /> HOV Projects 2 Multimodal Transportation Facility Phase III Smith&Pacific 1/98 $11,500,000 • ET No map <br /> HOV Projects 2 SR 99 North Transit Priority SR 99 8/96 2/97 8/97 $555,000 ET No map <br /> HOV Projects 2 SR-99 Transit/HOV Treatment SR 99 7/99 $1,000,000 • ET No map <br /> HOV Projects 2 Evergreen Way Transit/HOV Treatment Evergreen Way 7/99 $1,000,000 • ET No map <br /> HOV Projects 3 Park&Ride Facilities Various Locations 7/99 $3,000,000 • TBD No map <br /> HOV Projects 1 South Everett Transit Center Phase I Everett Mall Area 1/97 $235,000 ET No map <br /> HOV Projects 1 South Everett Transit Center Phase II Everett Mall Area 7/97 $0 ET No map <br /> HOV Projects 1 South Everett Transit Center Phase III Everett Mall Area 7/98 $3,000,000 • ET No map <br /> NOV Projects 1 North Everett Transit Center Phase I Everett C.C.Area 3/97 $175,000 ET No map <br /> HOV Projects 1 North Everett Transit Center Phase II Everett C.C.Area 3/98 $1,500,000 ET No map <br /> TDM Projects 2 Innovative Employer Programs(DIME) N/A $160,000 ET No map <br /> TDM Projects 2 Expanded City Rideshare Program(MOVE) N/A $100,000 ET No map <br /> TDM Projects 2 Implementation of State CTR Law N/A $150,000 ET No map <br /> Non-Motorized 2 Bicycle and Pedestrian Plan Various Locations $20,000 EVT No map <br /> Regional Transit 2 Regional Transit Investments Not yet determined Unknown• RTA No map <br /> •A portion or all of the funding for these projects has not yet been committed. <br /> NOTE:Projects shown in bold type were not included in the 1996-2001 Six-year TIP. <br /> 97tipsum.wb2 <br />