Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1997 TO 2002 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 1 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC INTERSTATES AND FREEWAYS Resolution No. <br /> •F P PHUJEC I IDENI Il-ICA I ION I S T U PROJEC I COSTS IN THOUSANDS OFMLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N i A.FEDERAL AID NO. p a t o i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.BRIDGE NO. r T t a n I o PROJECT MONTH/Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T I r C.PROJECT TITLE o y u 19 i d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUND 4th, ENVIR.RNV <br /> N a i N D.STREET/COUNTY ROAD NAME OR NUMBER v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t o E.TERMINAL BEGINNING AND END .e h y s STARTS Phase UATA 6th Y/N <br /> s y. F.DESCRIBE WORK TO BE DONE OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 12 1 A.0526 08 0.2 0 PE 4/96 157.5 STP EIS: No <br /> B.526/18 04 F RNV OTHER 500 1500 2000 1900 CE:X <br /> C.SR 526/EVERGREEN WAY OVERCROSSING 06 CONST 8/96 892.5 STP EA: DATE: <br /> D.SR 526 AND EVERGREEN WAY 12 TOTAL 1050 N/A: <br /> E.EVERGREEN WAY OVERCROSSING <br /> F.DESIGN AND CONSTRUCT WIDENING OF OVERCROSSING <br /> 11 2 A. 0005 05 5.6 0 PE 3/93 EIS: <br /> B.N/A 06 P R/W 10/95 OTHER 32656 32656 17100 9002 1998 <br /> C.1-5 MEDIAN HOV LANES;164TH HOV I/C;MEDIAN REVEG. 12 CONST 7/96 EA: DATE: <br /> D.INTERSTATE 5 TOTAL N/A: <br /> E.164TH STREET S.E.TO SR 526 <br /> F.DESIGN AND CONSTRUCT MEDIAN HOV LANE SYSTEM <br /> 11 3 A. 0005 05 5.6 0 PE 8/98• EIS: <br /> B.N/A 06 P R/W 8/2000* OTHER 25000 25000 1250 23750 CE: <br /> C.1-5 HOV LANES 12 CONST 2/2001' EA: DATE: <br /> D.INTERSTATE 5 TOTAL N/A <br /> E.SR 526 TO 41ST STREET <br /> F.DESIGN AND CONSTRUCT MEDIAN HOV LANES <br /> 11 4 A. 0005 05 5.6 0 PE 8/98' EIS: <br /> B.N/A 06 P RNV 8/2000* OTHER 25000 25000 1250 23750 CE: <br /> C.1-5 HOV LANES 12 CONST 2/2001' EA DATE: <br /> D.INTERSTATE 5 TOTAL N/A: <br /> E.41ST STREET TO SR 2 <br /> F.DESIGN AND CONSTRUCT MEDIAN HOV LANES;AUXILIARY LANE , <br /> 11 5 A.2776,0005 03 0.3 0 PE 8/98* EIS: <br /> 14 B. 05 P RNV 8/2000' OTHER 8000 8000 500 7500 CE: <br /> C.I-5/41ST STREET DIRECT HOV LANE ACCESS RAMP 10 CONST 2/2001' EA: DATE: <br /> D.41ST STREET TOTAL N/A: <br /> E.41ST STREET OVERCROSSING TO SB INTERSTATE 5 <br /> F.DIRECT ACCESS RAMP FROM 41ST STREET TO SB 1-5 HOV LANE <br /> 11 6 A.2764,0005 03 0.3 0 PE 8/98* EIS: <br /> 14 B. 05 P RNV 8/2000' OTHER 8000 8000 500 7500 CE: <br /> C.I-5/PACIFIC AVENUE DIRECT HOV LANE ACCESS RAMPS 10 CONST 2/2001* EA: DATE: <br /> D.PACIFIC AVENUE TOTAL N/A: <br /> E.INTERSTATE 5 OVERCROSSING TO PACIFIC AVENUE <br /> F.SB ON,NB OFF DIRECT ACCESS RAMP FROM PACIFIC TO I-5 HOV LAN _ <br /> 11 7 A.2588,0005 03 0.3 0 PE 8/98* EIS: <br /> 14 B. 05 P R/W 8/2000` OTHER 14000 14000 1000 13000 CE: <br /> C.1-5/112TH STREET FLYER STOP,DIRECT ACCESS RAMPS,P/R LOT 10 CONST 2/2001' EA: DATE: <br /> D.1-5,112TH STREET TOTAL N/A: <br /> E.1-5,112TH STREET <br /> F.DIRECT ACCESS HOV LANE RAMPS,TRANSIT FLYER STOP,P/R LOT <br /> 12 8 A.0526 05 3.2 0 PE 5/2001*' EIS: <br /> B.N/A 06 P P RNV OTHER 25000 25000 25000 CE: <br /> C.SR 526 HOV LANE 12 CONST 2/2002* EA: DATE: <br /> D.SR 526 TOTAL N/A: <br /> E.1-5 TO 34TH AVENUE WEST <br /> F.DESIGN AND CONSTRUCT PERMANENT HOV LANE <br /> 11 9 A.0096,0005 04 0.2 0 PE 3/94* EIS: <br /> 14 B. 06 F RNV CE: <br /> C.HOV TREATMENT OF SR 96/1-5 INTERCHANGE 12 CONST 6/98* EA: DATE: <br /> B.128TH STREET S.E.AND 1-5 TOTAL OTHER 1600 400 2000 1800 N/A: <br /> C.SR 96/1-5 INTERCHANGE <br /> D.DESIGN/CONSTRUCT HOV FACILITIES ON RAMPS AND OVERPASS <br /> 11 10 A.0005,2764,0002,2776,ETC. 31 00 0 PE 3/98' EIS: <br /> 12 B. RNV CE: <br /> 14 C.INTERCHANGE STUDIES AND IMPROVEMENTS CONST EA: DATE: <br /> D.1-5/12TH STREET NE;I-5/PACIFIC STREET;1-5/SR 2;1-5/41 STREET;ETC. P TOTAL 500 500 500 N/A: <br /> E.VARIOUS INTERCHANGES <br /> F.STUDY,DESIGN,AND CONSTRUCT INTERCHANGE IMPROVEMENTS <br /> p'A portion or all of the funding for these project phases has not yet been committed. <br /> NOTE"Local Funds"include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />