Laserfiche WebLink
i <br /> guardrail hcight and have enough lengih to provide strong supPort at the bottom I plan on buying <br /> pressure ireated 2x4s l Oft lo��g, cut them in half, then rip thcm down U�e middie creating Sfl long 2x2 <br /> sticks. I will trc�at the cut side with widi water prooting materiaL All sticks and tread boards will be <br /> attached with exterior 3in deck screws. I <br /> 1 plan on meeting all new handrail codes during the stainvay reconstruction. <br /> Another area wherc 1 am rcqucsting a variance from new construction codc is post foundation. "fhe <br /> loundation of currcnt posts havc bccn thcrc 1'or a vcry long time. 1 havc replaccd thc posts ovcr thc i <br /> ycars as necded but thc upper deck has staycd surprisingly level. Thc posts are on cement Ulocks and � <br /> growid under thcm is solid and has not Uccn disturUcd. Thc fact that the deck has stayed Ievel all thesc <br /> years atlesls to their foundation strength. <br /> "fhis is an existing dcck and an existing stainvay praviding inc only cntrancc and exit ibr hvo Camilies. <br /> [3oth ol'our goals is to provide a sale and lasting dec}: and st�irway for the buildin�;s residents and <br /> emer�cncy scrvices. Tearing it completely down and rebuilding it as new construction is not possible <br /> with pcople living there. 1 fecl 1 cun replace the majoriry of the exis;ing wood with new pressurc <br /> treatcd wood and mcet the new code on thc majority of thc situations. 'fhe variances are minor and <br /> would allow me to do thc necessary work while allowing lamilics to get in and out of their apartments. <br /> I'hank you ibr your undcrstanding and consideralion. <br /> Sinccrcly �il <br /> �� , p � <br /> pL�^..^�L�".( �i� .,� `/.���iG <br /> 'I�i�uothy U Sicr <br />� <br /> _, <br /> ��� � <br /> I <br /> I <br />