My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 15TH ST 2016-01-01 MF Import
>
Address Records
>
15TH ST
>
3315
>
3315 15TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 1:05:41 PM
Creation date
4/4/2017 1:05:12 PM
Metadata
Fields
Template:
Address Document
Street Name
15TH ST
Street Number
3315
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION FOR DE7ELOPGR: <br /> 1 . Detailed drawings in accordance with City Design and Construction <br /> SL•andards shall be submitted to the Public Works Department showing <br /> sita parking layout, landscaping, utilities, storm drainage, temporary <br /> construction erosion control, and all required improvements in the <br /> public right-of-way. Public Works Department approval of these <br /> drawings is required pr'.or to any permits being issued. A11 <br /> impr�ovements shall be completed, approved, and warranted before the <br /> Qccupancy Permit is issued. <br /> 2. City streets are to be kept clear of dirt and debris at all times <br /> during construction. Dust suporession and street cleaning must occur <br /> as directed by the Public Works Inspector. <br /> 3• P�rformance guarantees are required for the street and utility <br /> construction. <br /> 4. A one-year gua:antee is required on the public street and utillT,ies for <br /> an amount not less than 10$ of the cost of construction and shall run <br /> for one year from the dat� of issuance of the Occupancy Permit for the <br /> pro,ject. <br /> 5• A two-year guarantee is required for private retention/detention or <br /> other drainage treatment/abatem:�nt facilities serving areas larger than <br /> one acre. <br /> 6. On-site Natermain will be staked within an easement to the City. The <br /> easement wi11 be submitted to the City prior to the issuance of permits. <br /> 7. As-builts of storm sewer, sanitary sewer, and water systems will be <br /> required to be submitted per City design and construction standards and <br /> specific:,tions. <br /> 8. The utilities in 15th St. are shallow and may require relocation to <br /> properly grade the sti•eet. <br /> 4133F <br />� I <br />
The URL can be used to link to this page
Your browser does not support the video tag.