Laserfiche WebLink
4 <br /> A <br /> ! <br /> �� ���f� �: ICI:�A� <br /> �Y�. � <br /> • ; EQUIPMENT, INC. <br /> '� i � � � : <br />�F. =t� � ; 4301 LEARY WAY N.W. • P.O. 60X C�70733 <br /> SEATTLE, WASHINGTON 981C7 <br /> .� ,. (2Q6)784Q3'2 • FAX(20G)7824085 <br /> rj <br /> l <br /> March 25 , 1991 <br /> Burlington Northern Railroad <br /> 2000 First Interstate Center <br /> 999 Third Ave <br /> Seattle , WA 98104-1105 <br /> Attn : Clarence Johnson - Field Engineer <br /> Re : Sanitary Se�aer Line at Everett , Washington <br />,.. <br />; Dear Clar?nce , <br /> I have reviewed the two pump s�ation requirements �aith the <br />;�: elevation drawing you sent me and offer the fr�llowing selec- <br />,I' � tions . <br /> The Barnes Submersible Pump SE51 , 1/2 NP would be suitable . <br /> for both lift stations using � PVC 5-40 pipe for the shorten <br />: ��� <br />� 285 foot run and 2 1/2" 'UC S-40 pipe for the 890 foot longer <br /> � run . <br />�:. ' <br />� s, Each pump station would include the following material : <br /> Two each Peabody Qarnes Submersible Raw Sewage Pumps , Model <br /> SE51 , 1/2 H .P . , 115 Volt Single Phase , 60 Hertz . 2" �is- <br /> charge , wili pass 2" diameter spheres . Pumps equipped with <br /> standard 15 foot 14/3 power cord and 3-pin plug. <br /> The two p�mps would be controlled by a "S .J . Electro" Duplex <br /> Alternating Pump Control Panel Model Number 1202-01 . The <br /> panel has a NEMA 4X outdoor enclosure and includes an alarm <br /> light and horn as a standard feature . <br /> ENGINES • GENERATORS • HYDRAULIC SYSTEMS • PUMPS • WINCHES <br /> _ � <br />