My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10915 16TH AVE SE 2016-01-01 MF Import
>
Address Records
>
16TH AVE SE
>
10915
>
10915 16TH AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 1:18:04 PM
Creation date
4/4/2017 1:17:17 PM
Metadata
Fields
Template:
Address Document
Street Name
16TH AVE SE
Street Number
10915
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� f� <br /> ; <br /> , <br /> �� . � <br /> t�;,. <br /> ;�� <br /> ::�� <br /> � <br /> ., <br /> , '`�� <br /> TO BE COMPLETED BY APPLICANT ..�-� <br /> EV�LU.ITION FOR <br /> ACENCY USE ONLY <br /> c. What general types of soils are (ound on the site (for example, clay, sand, gravel, peat, � I ' <br /> muck)? IF you know the classification oi agricultural soils, speciFy them and noce any prime i :":;y�' <br /> farmland. <br /> Alderaiood Gravelly S�ndy Loam <br /> d. Are there surface indicacions or history of unstable soils in the immediate vicinity? 1(so, <br /> describe. i <br /> No. <br /> y � e. Describe the purpose, type, and approximace quantities of any filling or brading pro- � <br /> posed. Indicate source of fill. <br /> Approximately 530 � .y, excavation for partial daylight basemenl Co <br /> be redistributed on site. <br /> f. Could erosion occur as a resul[ oF clearing, construction, or use'? I(so, generally describe. <br /> Minor erosion of small slope at S.E. property line abutting <br /> shopping cen[er parking lot, if grading occurs at that point. <br /> g. Ahout what percent of the site will be covered with impervious surfaces after project <br /> cons[ruction ((or exampic, asphalt or buildings)? <br /> Approximately 38� <br /> h. Proposed measures to reduce or cantrol erosion, or other impac[s to the earth, i(any: <br /> N/A <br /> 2. Air <br /> a. What types oF tmissiuns to [he air would result From the proposal (i.e., dust, aummobile, <br /> odors, indus[rial wood smoke) during cons[ruc[ion and when the project is completed? If <br /> any, generally describe and give approximate quancities if known. <br /> During construction: dust, vehicle emissions, building process <br /> emissions (chemical/diesei etc. ) <br /> After construction: vehicle emissions. <br /> b. Aro there �ny ofF—sitz sources of amissions or odor eha[ may affect your proposal? If so, <br /> generally describe. <br /> Traffic on 16th Avenue S.E. , trucl< deliveries to shopping center on <br /> [he abutting easterly property. <br /> c. Proposed measures to reduce or con[rol emissians or othcr impaccs to air, if any: <br /> None <br /> 7. <br />
The URL can be used to link to this page
Your browser does not support the video tag.