Laserfiche WebLink
� _ _ _ _ __ _ _ ___. _ __ _ . <br /> � � � <br /> H <br /> x <br /> Cy�yGy I <br /> HZ � <br /> �C C] <br /> H �1 I <br /> �1yH � <br /> t+f 0� <br /> H t7 <br /> OH <br /> O <br /> C�]� C1 I <br /> H <br /> zH ! <br /> 8. List any environmental infarmation you know about that has been prepared, <br /> � y H or will be prepared, directly related to this proposal . <br /> c� t7m . <br /> Preliminary Topographic 14apping <br /> �� � Soils and Geotechnical Studies <br /> y o� South Everett Drainage Basins Plan. Basins Plan Report Number 2. Lake , <br /> Washington Drainage Area. <br /> Silver Lake Water Quality, Nutrient Loading and Mana9ement (U.W. Water <br /> Resources Series Technical Report No. 106) <br /> 4letland Evaluation of LID Property (Memo to Everett Public Works <br /> Department) ' <br /> Draft Wetland Delineation for Breckenridge Apartments (Attachment B; Final <br /> to be submitted) i <br /> Wetlands Survey (Attachment Bi) ' <br /> Traffic Impact Analysis for Breckenridge Apartments (Attachment C) <br /> 9. Do you know whether applications are pending for governmental approvals of <br /> other proposals directly affecting the property covered by your proposal? If <br /> yes, explain. <br /> � e`► Yes. The City of Everett has applied for a State Centennial Clean Water <br /> � ��.1 Fund Grant to construct a regional wet pond on the adjacent Phase 2 ' <br /> 1 property to the east. As recommended in the UW Silver Lake water quality <br /> study, the pond is an integral element in the potential reduction of <br /> 0'�� pollutant load�ng of Silver Lake due to existing land uses. <br /> �� <br /> 10. List any government approvals or permits that will be needed for your <br /> proposal , if known. <br /> pe� <br /> I ....1 Burning Permits - W�NR <br /> ' Grading Permit - City of Everett ; <br /> Preliminary & Final Drainage Plans - City of Everett <br /> ( ' i Building Permits - City of Everett <br /> 11. Give brief, complete description of your proposal , including the proposed <br /> use and the size of the project and site. There are several questions later <br /> e�, in this checklist that ask you to describe certain aspects of your proposal . ', <br /> ��� You do not need to repeat those answers on this page. (Lead agencies may i <br /> modify this firm to include adrlitional specific information on project <br /> � description.) � <br /> ����Q " The proposed project involves the construction of 220 multifamily units an ; <br /> 11.364 acres at a density of 19.36 dwelling units per acre. A zero- <br /> clearance fireplace approved by the City of Everett and which is exempt <br /> from Washington State certification standards will be installed 136 of the <br /> units. Parking for approximately 344 vehicles will be provided. A <br /> recreational facility including a swimming pool will be constructed. <br /> Selected existin9 ever9reens will be retained on the site and cleared <br /> vegetation will be supplemented with plantings of lawns and native and <br /> ornamental trees and shrubs. The proposal will be served by public sewers <br /> and utilities. Access to the site will be from 16th Avenue S.E. , a new <br /> roadway constructed to city standards. A storm drainage system will <br /> 2 <br /> � , <br />