Laserfiche WebLink
� <br /> AH <br /> ��.;, <br /> � � i <br /> y rx3 V� <br /> Hx � <br /> OpCO � <br /> '4f�nH <br /> � O � <br /> H C7 <br /> OH <br /> H"� g Plan Report Number 2, 1982) or within the Snohomish County � <br /> � �� Stream and Wetlands Survey. To the best knowledge of either the � <br /> � � applicant or contact person, no other documents classify <br /> g � y portions of the site as "environmentally sensitive." <br /> H <br /> �q�' . i . ppproximately how many people would reside or work in the <br /> �' � completed project? <br /> y ��' On the basis of 1.6 persons per mult.i-family unit, 220 new <br /> ' households within the completed project will produce a site <br /> population of approximately 352 persons. <br /> j. Approximately how many people would the completed project <br /> displace? <br /> None will be displaced. <br /> k. Proposed measures to avoid or reduce displacement impacts, if <br /> any: <br /> No measures are proposed in addition to providing 220 new multi- <br /> , +, <br /> family residences. <br /> � ��� 1 . Proposed measures to ensure the proposal is compatible witii <br /> � existing and projected land uses and plans, if any: <br /> 1 '��,,,� Th2 characteristics of the development and relationships of <br /> ��� � density within the project compare favorably with that found in <br /> i neighboring areas. The proposal is in conformance with existing <br /> and proposed land uses and plans. <br /> i <br /> i '��' 11 <br /> ��' 9. HOUSING <br /> + a. Approximately how many units would be provided, if any? <br /> i�`� Indicate whether high, middle, or low-income housin9. <br /> , 220 middle income, multi-family units wiil be provided. <br /> ���► b. Approxiinately how many units, if any, would be eliminated? <br /> .� Indicate whether high, middle, or low-income housing. <br /> i5 <br /> No units will be eliminated. <br /> I l��.� ; , c. Proposed measures to reduce or control housing impacts, if any: <br /> � No deleterious housing impacts are anticipated and no m�tigation <br /> is proposed. Market analyses indicate an ongoing need for <br /> middle income, multi-family housing in the area within �ahich <br /> the project is located. <br /> 17 <br /> i�e <br />