Laserfiche WebLink
11 <br />CITY OF EVERETT 2016 TO 2021 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br />1:3-1 -f PROjECIT -10- PE RIW CONST. Est 2015-20 LEAD MAP <br />Number <br />TYPE <br />RITY <br />PROJECT NAME <br />START <br />START <br />START <br />Expenditures AGENCY <br />NO. <br />4 <br />Local ACGesS-SAF <br />1 <br />BNSF RR safety improvements <br />Jan,15 <br />Jun.16 <br />$600,000 EVERETT <br />4 <br />Local AccessSAF <br />2 <br />Local Roadway Safety Projects <br />Jan.15 <br />Jun.16 <br />$120,ODDI IEVFRETT <br />44 <br />Local Access -W <br />3 <br />Safe Routes to Schools <br />Jan.15 <br />Apr.16 <br />$600,DDD EVERETT <br />4 <br />Local Access -PRIM <br />1 <br />Bddge Rehabitation Program <br />Jan.15 <br />Jul,t6 <br />53,O00,0DD EVERETT <br />46 <br />Local Access -PRIM <br />2 <br />Annual Street Overlay Program <br />Jan.15 <br />J.y <br />$6,000,000 EVERETT <br />4 <br />Local Access -PRIM <br />3 <br />Sidewalk repair and replacement <br />Jan.15 <br />1 <br />May16 <br />$360,000 EVERETT <br />LoTT <br />cal Access -PRIM <br />4 <br />Pavement Marking Project <br />Jan.15 <br />May 16 <br />$210,000 EVERETT <br />4 <br />Local Access-STR <br />1 <br />106th Place BE Improvements <br />NDv.10 <br />Jun.76 <br />$650,001) ` EVERETT <br />35 <br />Local AccessSTR <br />2 <br />3rd Avenue BE Street Improvements <br />Jan.15 <br />Apn16 <br />$675,000 EVERETT <br />36 <br />1 <br />Local Access -5 15 <br />3 <br />Local Street Improvements <br />JuL15 <br />May 16 <br />Jun.16 <br />5560,0D0 EVERETT <br />$300,000 EVERETT <br />37 <br />52 <br />1 Loral Access -SIR <br />4 <br />Upper & Lower THge Rd. Sir. Improv. <br />Aug 15 <br />Aug.15 <br />Jun.t6 <br />$2,000,DD1) EVERETT <br />36 <br />53 <br />1 Local AccessSTR <br />5 <br />S'unpson Site Access Improvements <br />Jul.14 <br />Jan. 15 <br />Apr. 16 <br />$8,000,000 ` EVERETT <br />39 <br />54 <br />1 Local AccessSTR <br />6 <br />Downtown Streetscape Improvements <br />Jan.15 <br />Ju1.15 <br />$240,0DD EVERETT <br />Local AccssS)G <br />NIK3 <br />1 <br />Traffic Signal Central Controller Replacement <br />Jan.15 <br />May,1557 <br />$240,000 EVERETT <br />Local Acc <br />2 <br />Traffic Signallnierconnect <br />Jan.15 <br />Jun.75 <br />$900,OD0 EVERETT <br />1 Local Access -SIG <br />3 <br />Traffic Signal Improvements <br />Jan.15 <br />Jun.15 <br />$500,000 EVERETT <br />51, <br />Local AecessSIG <br />4 <br />Trarnc Sign Improvements <br />Jan.15 <br />May.15 <br />$360,000 EVERETT <br />Local Access -NEI <br />1 <br />Neighborhood Block Grants <br />Jan.15 <br />May.15 <br />$2,400,000 EVERETT <br />Local Access -NEI <br />2 <br />Neighb. Traffic Mitigation Studs & Projects <br />Jan.15 <br />May.15 <br />$2,400,000 EVERETT <br />1 <br />4 <br />Local Access -NEI <br />Local Access -NM <br />3 <br />1 <br />Residential Sidewalks <br />36th Street/BNSF Rail Line Ped/Bike Crossing <br />Jan 08 <br />Nov.16 <br />Jun.17 <br />52,800,000 ' EVERETT <br />40 <br />65 <br />1 Local Access -NM <br />2 <br />Smith Island Bike/Ped improvements <br />Jan.10 <br />Jan.16 <br />May 18 <br />51,000,ODO ` EVERETT <br />I 41 <br />Local AccessNM <br />3 <br />8icyle Mzsfer Plan Implements6on <br />Jan.15 <br />Jan.t6 <br />5200,OD0 • �EVERETT <br />Local AccassNM <br />4 <br />Riverside Business Park Ped tract <br />Apr.09 <br />Apr.16 <br />$700,000 • EVERET T <br />42 <br />Local AccessNM <br />5 <br />West/Easi Marine View Drjve'Bike-Ped Improvements <br />Aug.09 <br />Apr.16 <br />$500,DD0 ` EVEREfT <br />43 <br />- <br />Looal Access -NM <br />6 <br />47th Street Pedestrian Improvements <br />Jan.15 <br />Jun.t6 <br />$501),1)01) tl/F1iET <br />44 <br />Local Access -NMA <br />7 <br />Pigeon Creek No. 1BNSF Crossing <br />Jan. 10 <br />Jul. 16 <br />Jan.i7 <br />5925,DOD EVERETT <br />45 <br />Local Access -NM <br />B <br />Henry Jackson Park Ped Bridge <br />Jari <br />May.1o" <br />JuL" <br />52,700,000 EVERETT <br />46 <br />Fl <br />Local AccessNM <br />9 <br />Grand Ave1N. Manna Ped -Bike Connection <br />Jan. 15 <br />Jan. 66 <br />May 17 <br />51,DSD,ODD EVEREfT <br />Local Access -NMI <br />10 <br />Shoreline Access Improvements <br />Apr.15 <br />I Jan.16 <br />$2,400,000 EVERETT <br />, <br />Local A ess-NM <br />11 <br />Snohomish River Sike and Ped. Bride <br />NOV.o1 <br />I <br />Jan.16 <br />$9,000,000 ` EVERETT <br />47 <br />74 <br />Local Access -NM <br />12 <br />Pigeon Creek Road No. 1 Improvements - <br />Apr.15 <br />Jan.16 <br />911000,Dw tVERETT <br />48 <br />75 <br />1 Local AccessNl,A <br />13 <br />L Snohomish River Rd. Bike/Ped Connection <br />May.15 <br />ug.16 <br />Jan.17 <br />$1,500,000 EVERETT <br />49 <br />id <br />Local Access -NM <br />14 <br />Eve refl Non -Motorized Projects <br />) May.15 <br />Aug 16 <br />Jan. 17 <br />$760,OD1) EVERETT <br />/ <br />Local Access -NM <br />15 <br />Riverfront District Bike/Ped Paths <br />Jul. 09 <br />Jan.16 <br />$500,1)00 EVERETT <br />8 <br />Local Access -N2 <br />16 <br />Interurban Trail Bike/Ped Path Improvements <br />Jul. 10 <br />Jan.16 <br />$500,0D0` IEVERETT <br />19 <br />Local Access -NMI <br />17 <br />1 B¢,yle Detection Signals <br />Jan.15 <br />Jan.16 <br />5200,00D ` EVERETT <br />Local AccesstJM <br />18 <br />ADA Signals <br />Jan.15 <br />Jan.16 <br />52DD,DOD ` EVERETf <br />Local Acoess-NIA <br />19 <br />ADA Ramps <br />Jan.15 <br />Jan.15 <br />$200,000 ` EVERETT <br />l <br />$57,130,000 <br />NOTE: Projects shown in bold type CO any) were not included in the 2015-2020Siz year TIP. <br />`A portion or a0 of the funding for this project has not yet been committed <br />Codes: SAF= Safey, PRIM= Preservation and Maintenance; STR =Street construction; SIG=Tr=n'r Sional Improvement; <br />NEI = Neighborhood Projects; LS = Landscaping Projeck NM = Non -Motorized Improvemant <br />27 <br />