|
11
<br />CITY OF EVERETT 2016 TO 2021 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br />1:3-1 -f PROjECIT -10- PE RIW CONST. Est 2015-20 LEAD MAP
<br />Number
<br />TYPE
<br />RITY
<br />PROJECT NAME
<br />START
<br />START
<br />START
<br />Expenditures AGENCY
<br />NO.
<br />4
<br />Local ACGesS-SAF
<br />1
<br />BNSF RR safety improvements
<br />Jan,15
<br />Jun.16
<br />$600,000 EVERETT
<br />4
<br />Local AccessSAF
<br />2
<br />Local Roadway Safety Projects
<br />Jan.15
<br />Jun.16
<br />$120,ODDI IEVFRETT
<br />44
<br />Local Access -W
<br />3
<br />Safe Routes to Schools
<br />Jan.15
<br />Apr.16
<br />$600,DDD EVERETT
<br />4
<br />Local Access -PRIM
<br />1
<br />Bddge Rehabitation Program
<br />Jan.15
<br />Jul,t6
<br />53,O00,0DD EVERETT
<br />46
<br />Local Access -PRIM
<br />2
<br />Annual Street Overlay Program
<br />Jan.15
<br />J.y
<br />$6,000,000 EVERETT
<br />4
<br />Local Access -PRIM
<br />3
<br />Sidewalk repair and replacement
<br />Jan.15
<br />1
<br />May16
<br />$360,000 EVERETT
<br />LoTT
<br />cal Access -PRIM
<br />4
<br />Pavement Marking Project
<br />Jan.15
<br />May 16
<br />$210,000 EVERETT
<br />4
<br />Local Access-STR
<br />1
<br />106th Place BE Improvements
<br />NDv.10
<br />Jun.76
<br />$650,001) ` EVERETT
<br />35
<br />Local AccessSTR
<br />2
<br />3rd Avenue BE Street Improvements
<br />Jan.15
<br />Apn16
<br />$675,000 EVERETT
<br />36
<br />1
<br />Local Access -5 15
<br />3
<br />Local Street Improvements
<br />JuL15
<br />May 16
<br />Jun.16
<br />5560,0D0 EVERETT
<br />$300,000 EVERETT
<br />37
<br />52
<br />1 Loral Access -SIR
<br />4
<br />Upper & Lower THge Rd. Sir. Improv.
<br />Aug 15
<br />Aug.15
<br />Jun.t6
<br />$2,000,DD1) EVERETT
<br />36
<br />53
<br />1 Local AccessSTR
<br />5
<br />S'unpson Site Access Improvements
<br />Jul.14
<br />Jan. 15
<br />Apr. 16
<br />$8,000,000 ` EVERETT
<br />39
<br />54
<br />1 Local AccessSTR
<br />6
<br />Downtown Streetscape Improvements
<br />Jan.15
<br />Ju1.15
<br />$240,0DD EVERETT
<br />Local AccssS)G
<br />NIK3
<br />1
<br />Traffic Signal Central Controller Replacement
<br />Jan.15
<br />May,1557
<br />$240,000 EVERETT
<br />Local Acc
<br />2
<br />Traffic Signallnierconnect
<br />Jan.15
<br />Jun.75
<br />$900,OD0 EVERETT
<br />1 Local Access -SIG
<br />3
<br />Traffic Signal Improvements
<br />Jan.15
<br />Jun.15
<br />$500,000 EVERETT
<br />51,
<br />Local AecessSIG
<br />4
<br />Trarnc Sign Improvements
<br />Jan.15
<br />May.15
<br />$360,000 EVERETT
<br />Local Access -NEI
<br />1
<br />Neighborhood Block Grants
<br />Jan.15
<br />May.15
<br />$2,400,000 EVERETT
<br />Local Access -NEI
<br />2
<br />Neighb. Traffic Mitigation Studs & Projects
<br />Jan.15
<br />May.15
<br />$2,400,000 EVERETT
<br />1
<br />4
<br />Local Access -NEI
<br />Local Access -NM
<br />3
<br />1
<br />Residential Sidewalks
<br />36th Street/BNSF Rail Line Ped/Bike Crossing
<br />Jan 08
<br />Nov.16
<br />Jun.17
<br />52,800,000 ' EVERETT
<br />40
<br />65
<br />1 Local Access -NM
<br />2
<br />Smith Island Bike/Ped improvements
<br />Jan.10
<br />Jan.16
<br />May 18
<br />51,000,ODO ` EVERETT
<br />I 41
<br />Local AccessNM
<br />3
<br />8icyle Mzsfer Plan Implements6on
<br />Jan.15
<br />Jan.t6
<br />5200,OD0 • �EVERETT
<br />Local AccassNM
<br />4
<br />Riverside Business Park Ped tract
<br />Apr.09
<br />Apr.16
<br />$700,000 • EVERET T
<br />42
<br />Local AccessNM
<br />5
<br />West/Easi Marine View Drjve'Bike-Ped Improvements
<br />Aug.09
<br />Apr.16
<br />$500,DD0 ` EVEREfT
<br />43
<br />-
<br />Looal Access -NM
<br />6
<br />47th Street Pedestrian Improvements
<br />Jan.15
<br />Jun.t6
<br />$501),1)01) tl/F1iET
<br />44
<br />Local Access -NMA
<br />7
<br />Pigeon Creek No. 1BNSF Crossing
<br />Jan. 10
<br />Jul. 16
<br />Jan.i7
<br />5925,DOD EVERETT
<br />45
<br />Local Access -NM
<br />B
<br />Henry Jackson Park Ped Bridge
<br />Jari
<br />May.1o"
<br />JuL"
<br />52,700,000 EVERETT
<br />46
<br />Fl
<br />Local AccessNM
<br />9
<br />Grand Ave1N. Manna Ped -Bike Connection
<br />Jan. 15
<br />Jan. 66
<br />May 17
<br />51,DSD,ODD EVEREfT
<br />Local Access -NMI
<br />10
<br />Shoreline Access Improvements
<br />Apr.15
<br />I Jan.16
<br />$2,400,000 EVERETT
<br />,
<br />Local A ess-NM
<br />11
<br />Snohomish River Sike and Ped. Bride
<br />NOV.o1
<br />I
<br />Jan.16
<br />$9,000,000 ` EVERETT
<br />47
<br />74
<br />Local Access -NM
<br />12
<br />Pigeon Creek Road No. 1 Improvements -
<br />Apr.15
<br />Jan.16
<br />911000,Dw tVERETT
<br />48
<br />75
<br />1 Local AccessNl,A
<br />13
<br />L Snohomish River Rd. Bike/Ped Connection
<br />May.15
<br />ug.16
<br />Jan.17
<br />$1,500,000 EVERETT
<br />49
<br />id
<br />Local Access -NM
<br />14
<br />Eve refl Non -Motorized Projects
<br />) May.15
<br />Aug 16
<br />Jan. 17
<br />$760,OD1) EVERETT
<br />/
<br />Local Access -NM
<br />15
<br />Riverfront District Bike/Ped Paths
<br />Jul. 09
<br />Jan.16
<br />$500,1)00 EVERETT
<br />8
<br />Local Access -N2
<br />16
<br />Interurban Trail Bike/Ped Path Improvements
<br />Jul. 10
<br />Jan.16
<br />$500,0D0` IEVERETT
<br />19
<br />Local Access -NMI
<br />17
<br />1 B¢,yle Detection Signals
<br />Jan.15
<br />Jan.16
<br />5200,00D ` EVERETT
<br />Local AccesstJM
<br />18
<br />ADA Signals
<br />Jan.15
<br />Jan.16
<br />52DD,DOD ` EVERETf
<br />Local Acoess-NIA
<br />19
<br />ADA Ramps
<br />Jan.15
<br />Jan.15
<br />$200,000 ` EVERETT
<br />l
<br />$57,130,000
<br />NOTE: Projects shown in bold type CO any) were not included in the 2015-2020Siz year TIP.
<br />`A portion or a0 of the funding for this project has not yet been committed
<br />Codes: SAF= Safey, PRIM= Preservation and Maintenance; STR =Street construction; SIG=Tr=n'r Sional Improvement;
<br />NEI = Neighborhood Projects; LS = Landscaping Projeck NM = Non -Motorized Improvemant
<br />27
<br />
|