Laserfiche WebLink
� . <br /> II <br /> I <br /> ;:`:. <br /> ,r�.:. <br /> '� PL/BL�"` �l/OlrXS' <br /> ,,. <br /> May 11, 1995 <br /> Mr. Chal;,s Morgan <br /> 7301 Beverly Lane <br /> Everett WA 98203 <br /> RE: Owner: Engineers Invest. Co. <br /> Job Address: Lake Pazk Apts., 16th Avenue <br /> Plan Check N: 46618 <br /> Dear Mr. Morgan: <br /> In response to your application for a consuuction permit, your plans have been <br /> examined and you are advised tha: the issuanc;e of a permit is being withheld for the <br /> reasons listed be]ow. These comments address building issues only, additional <br /> revisions or additions may be required hy other departments (such as Utilities, Planning <br /> or Fire). All references refer to the 1991 Uniform Building Code, as amendecl by the <br /> State of Washington and /or Washington State Energy Code 1994, lst Edition, unless <br /> stated otherwise. <br /> 1. The M-1 occupancies of building No. 1 add up to more than 300Q sq. ft. (only <br /> or.e area sepazation present). Sec. UBC 1102(b). <br /> 2. Provide calculations showing how building No. 1 meets the allowable azea <br /> requirements of UBC, Chapter 5. �o S �e � <br /> 3. Provide complete construction detail and justifying test result references for all <br /> vertical and horizontal occupancy separations and for the beams or co�unms that <br /> support them. Change the typical exterior 1 hr. wall design U026 to U032. <br /> (the UBC requires fire testing from both sides where other codes don't). <br /> 4. Standpipes are required as se[ forth in UBC Tbl. 38A and Sec. 3805(b). <br /> $, p stairway to the roof is required. See UBC Sec. 3306(n). I <br /> 6, Provide the engineers stamp on all "S' drawings. � <br /> 7, Provide special inspection requirements in conformance with UBC Sec. 306 for <br /> stnictural concrete, concrete reinforcing, welding and high strength bolts. <br /> CITY OF EVERETT• 3200 Ced�r Slreet • Everelt, 1NA 98201 • (206) 259-8800 • Fax (206) 259-8856 � <br />