Laserfiche WebLink
� �. <br /> PUBLIC WORKS FERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> C� ) Connect side �ewer per City Standard n's 601, E02, 604. <br /> / <br /> 7. Connect all rocftop downspouts to the side sawer. <br /> �8. .' Connect rooftop downspouts to the drainage system provided for this lot. li <br /> , <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of EvereY, <br /> Storm Manual 3-2.6.2. Width _, Depth _, Length_ <br /> 10. The contractor must meet with the Public Wurks Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> ( 11. nstall erosion control measures as determined by the Public Works inspector, such as silt <br /> � fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion controi rneasures per Ciiy of Everett Standarcls for smali parcels <br /> �13�emove erosion control measur�s upon completion of the pro}ect prior to final approval of the <br /> " permit. <br /> ��j ��j All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on ihis building lot. <br /> 15. Remove and replsce curb, gutter and sidewalk as per City of E�arett Standard Plan r's 3GSA <br /> & 306 on this proposal's frontage as directed by the Public'Nc�ks Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be repiac�d). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting p!ovisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 vdith a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for tnis building in ccmpliance with the requirements of NFDA <br /> Standards 13D. <br /> PVJCGr„mrnts <br /> �1z <br />